Crow River Regional Trail
Aug 7, 2026
Closes
Aug 27, 2026
4,027 SY remove bituminous pavement, 2,804 CY excavation (subgrade/common) , 5,672 CY common embankment (CV), 1,529 CY aggregate base (CV) class 6, 664 ton SP type 9. 5 wearing/non-wear course mix , 67,417 sf 3" bituminous walk, 1,017 LF 15"-24" RC pipe sewer DES 3006 CL V, 95 LF const drainage structure (4020-48-84), 4,092 LF concrete curb & gutter B424, 2,258 LF wire fence DES 60V-9322.
