Open RFPPlummer Community Corrections Center Building Demolition RFP
Description: The project generally consists of the complete demolition and removal of nine (9) existing buildings at the
former Plummer Community Corrections Center, including all associated building foundations, footings,
concrete slabs, and below-grade building construction. All demolition debris shall be removed from the
site and disposed of in accordance with applicable regulations. Existing site utilities shall be
disconnected, cut, and permanently capped at or immediately adjacent to each building. Existing site
utility distribution systems shall remain in place. All existing site improvements, including asphalt paving,
roadways, parking areas, sidewalks, curbing, and perimeter fencing, shall remain and be protected
throughout demolition activities. Following demolition, building excavations shall be backfilled and rough
graded to provide safe, stable, and properly draining conditions. Comprehensive site grading, paving
replacement, landscaping, and site redevelopment are not included in the project scope. Hazardous and
regulated material abatement will be completed by others prior to demolition.