Reidmore Road Sanitary Sewer Extension Project
Work includes approx 1,440 LF 1 1/2" SDR11 pipe by directional bore/open trenched; 40 LF 1 1/2" service lateral, trench detail; 1,507 SY superpave asphalt.
Description: The work consists of the installation of two grinder pumps and approx. 1,450 lf of 1. 5 sanitary sewer force main line along reidmore road, south connellsville borough. Excavating, backfilling and grading required for this work includes, but is not necessarily limited to: excavating, filing and backfilling for structures, footings, foundations, slabs, utilities, drainage, manholes, etc. ; trenching and trench backfilling; rough and finish grading of the site; restoration of disturbed surfaces; dewatering; furnishing and installing all required shoring, sheeting and bracing; furnishing and installing granular cushion or fill under all interior and exterior concrete slabs; furnishing of sub-base and base courses for paving; furnishing and installing rip-rap; and such other work.
City · PA, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Posted
Jun 30, 2026
Oct 13, 2026
Work includes approx 1,440 LF 1 1/2" SDR11 pipe by directional bore/open trenched; 40 LF 1 1/2" service lateral, trench detail; 1,507 SY superpave asphalt.
CityOH
Posted
Sep 23, 2026
Oct 13, 2026
Sanitary sewer improvements. Work includes clearing and grubbing; tree removal; 1,168 LF of 8" sanitary sewer; 2,197 LF of 8" sanitary sewer; 11 Ea 48" sanitary manhole; 2 Ea 48" sanitary drop manhole; 19 Ea 6" sanitary connection (long): 20 Ea 6" sanitary connection (short): 1,336 LF of 12" RCP storm sewer; 300 LF of 15" RCP storm sewer; 253 LF of 24" RCP storm sewer; 25 Ea 12" storm connections; 1,200 SF of asphalt drive; 300 SF of gravel drive. See outside link.
CityPA
Posted
Aug 30, 2026
Oct 9, 2026
Work includes sanitary / storm sewer improvement.
CityOH
Posted
Sep 18, 2026
Oct 5, 2026
Work includes approx. 1,000 feet of 3-inch diameter hdpe low-pressure sanitary sewer force main will be installed on river road, extending from the existing fairfield optimized senior living facility to lakeside drive. The project will also provide low-pressure force main services to nine properties on river road currently using septic systems, eliminating an environmental risk.