The work consists of the installation of two grinder pumps and approx. 1,450 lf of 1. 5 sanitary sewer force main line along reidmore road, south connellsville borough. Excavating, backfilling and grading required for this work includes, but is not necessarily limited to: excavating, filing and backfilling for structures, footings, foundations, slabs, utilities, drainage, manholes, etc. ; trenching and trench backfilling; rough and finish grading of the site; restoration of disturbed surfaces; dewatering; furnishing and installing all required shoring, sheeting and bracing; furnishing and installing granular cushion or fill under all interior and exterior concrete slabs; furnishing of sub-base and base courses for paving; furnishing and installing rip-rap; and such other work.