Posted
Oct 8, 2026
Nov 6, 2026
Hocking Recovery House Renovations
Work inlcudes recovery house renovations.
Description: Description of Work: Renovate and upgrade areas of the Solid Waste Scale House, including improvements to the control area, office areas, and extending the south scale building. An alternate is included in the bid for providing an additional restroom, expanding the employee break area and providing additional storage. The base design includes an addition extending the scale part of the building to the east with a PEMB that matches the existing building, renovations to the office section of the building that includes the control area on the east side to include providing at access windows with transaction drawing to the exit scale and refresh and updating of the three offices in the center section of the building. Alternate #1 includes a metal framed addition to the north side of the existing break room that will expand the current break area and add an additional restroom and storage space to the facility along with update and refreshing the finishes. Phasing of the project is most likely necessary as the scale house must remain operational at least in a limited capacity during construction. The Phasing plan will need to be coordinated with the city and the scale house staff.
City · WY, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalThese related opportunities are still open for bidding.
Posted
Oct 8, 2026
Nov 6, 2026
Work inlcudes recovery house renovations.
CityCT
Posted
Jun 16, 2026
Oct 27, 2026
Work includes renovation site is a four-floor building. The prospect shelter occupies floors one and two and new prospects is on floor three and four. Each floor will have renovations done to upgrade them to improve safety, energy efficiency, and the general environment including;furnish and install 106 led 2' x 4' drop ceiling ljghts throughout the building: approximately 22 recessed units and 84 flush mounted units 26,500. ; kitchen install 5pc. 4' x 8' fire rated panel wall covering compound/sand/paint entire room; medical room 1 & 2, replace drop ceiling with new armstrong 24"x24" acoustic tiles and grid compound/sand/paint entire room. ; furnish and install four new front entrance treads with new rubber treads. See attached file.
Utah Department of Government Operations
State AgencyUT
Posted
Oct 7, 2026
Oct 26, 2026
Demolition and renovation of areas in the basement, level 1, level 2, and level 3.
CityCT
Posted
Sep 28, 2026
Oct 27, 2026
Work includes apply compound, sand and repaint on all walls in laundry room; install fire rated walls in kitchen, and apply compound, sand, and paint; furnish and install new floors throughout prescribed areas; repair the damaged and broken stair components; provide and install rubber stair treads, 36" x 12", black, heavy-duty commercial grade, with slip resistant/nonskid surface. Treads shall be durable, resilient, and suitable for high-traffic interior stairways. Install securely over clean, sound stair surfaces using manufacturer-recommended adhesive and installation methods. Include all necessary adhesives, accessories, cutting, fitting, and labor for a complete installation on all stairs from 1st floor to stair leading to roof. See attached file.
Decision makers connected to this RFP from City of Casper.