Lakewood Road Sidewalk Reconstruction
Work includes 100 CY earth excavation; 7,650 LF saw cut existing pavement; 24 EA stone bound(monument) to be protected; 50 CY compacted granular fill; 83 LF geotextile silt fence; 22 EA catch basin sediment filter; 1,700 SY pavement restoration; 8 EA reset catch basin top; 7 catch basin top; 6 EA rebuild catch basin; 20 F structural repair concrete; 4,800 LB deformed steel bars-galvanized; 336 LF drill & grout reinforcing bars into existing concrete; 4,500 LF monolithic portland cement concrete curb; 1,800 SF integral rear sidewalk curb; 445 LF new granite curb. See outside link.