Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Seattle (Seattle Center) is soliciting bids to remove existing perimeter bollards and install owner-provided Gibraltar mechanical and fixed bollards, including sump pump and hydraulic power unit, repairs to concrete/ground finishes, and compliance with anti-terrorism criteria at the Seattle Center campus. Mandatory pre-bid site inspections are scheduled for December 17 and 18, 2025, contractor questions are due January 1, 2026 at 5:00 PM, and bids are to be opened on January 7, 2026 at 2:00 PM (Pacific Time); the engineer's estimate is $650,000. The project requires a 5% bid guaranty, prevailing wage compliance, payment/performance bonds, and Washington State contractor registration (this is a construction solicitation, not a grant).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work include, at two locations in the city, the removal of the entire existing retractable bollard array system, the entire footing, all components and conductors, and the construction of new retractable bollard array system and footings, inew electrical cabinets, new power pedestal, new stop/go traffic signals/signage, and all appurtenant work items.
Posted Date
Nov 6, 2025
Due Date
Dec 18, 2025
Release: Nov 6, 2025
Close: Dec 18, 2025
Work include, at two locations in the city, the removal of the entire existing retractable bollard array system, the entire footing, all components and conductors, and the construction of new retractable bollard array system and footings, inew electrical cabinets, new power pedestal, new stop/go traffic signals/signage, and all appurtenant work items.
Premium
Access the largest public sector contact database
The City of Bloomington, Indiana (Board of Public Works) seeks sealed bids for the Kirkwood Bollard Footing Installation Project to install crash-rated bollard footings and sleeves. Bids are submitted electronically through the City’s OpenGov procurement portal and this is an Invitation for Bid (sealed pricing). The posting includes project plans and forms on the portal and the bid submission deadline is Dec 15, 2025 at 12:00 PM Eastern.
Posted Date
Dec 3, 2025
Due Date
Dec 15, 2025
Release: Dec 3, 2025
Close: Dec 15, 2025
The City of Bloomington, Indiana (Board of Public Works) seeks sealed bids for the Kirkwood Bollard Footing Installation Project to install crash-rated bollard footings and sleeves. Bids are submitted electronically through the City’s OpenGov procurement portal and this is an Invitation for Bid (sealed pricing). The posting includes project plans and forms on the portal and the bid submission deadline is Dec 15, 2025 at 12:00 PM Eastern.
AvailableSeattle School District No. 1 (Seattle Public Schools) requests proposals to furnish and install network equipment, cabling, licenses, and management software across approximately 95 schools and facilities as a turnkey solution. The project replaces existing network switches and includes installation, configuration, basic testing, and coordination to meet project goals under the BEX V levy. Proposals are due January 8, 2026 at 10:00 a.m. PST, with RFP documents available via the Builders Exchange of Washington starting November 19, 2025.
Posted Date
Nov 19, 2025
Due Date
Jan 8, 2026
Release: Nov 19, 2025
Close: Jan 8, 2026
Seattle School District No. 1 (Seattle Public Schools) requests proposals to furnish and install network equipment, cabling, licenses, and management software across approximately 95 schools and facilities as a turnkey solution. The project replaces existing network switches and includes installation, configuration, basic testing, and coordination to meet project goals under the BEX V levy. Proposals are due January 8, 2026 at 10:00 a.m. PST, with RFP documents available via the Builders Exchange of Washington starting November 19, 2025.
AvailableCeiling & lighting replacement - future ready center.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
Close: Dec 18, 2025
Ceiling & lighting replacement - future ready center.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis