Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include, at two locations in the city, the removal of the entire existing retractable bollard array system, the entire footing, all components and conductors, and the construction of new retractable bollard array system and footings, inew electrical cabinets, new power pedestal, new stop/go traffic signals/signage, and all appurtenant work items.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The general items of work include, at two locations in the city, the removal of the entire existing retractable bollard array system, the entire footing, all components and conductors, and the construction of new retractable bollard array systems and footings, new electrical cabinets, new power pedestal, new stop/go traffic signals/signage, and all appurtenant work and other items not mentioned that are required by the plans and specifications.
Posted Date
Jul 4, 2025
Due Date
Dec 18, 2025
Release: Jul 4, 2025
Close: Dec 18, 2025
The general items of work include, at two locations in the city, the removal of the entire existing retractable bollard array system, the entire footing, all components and conductors, and the construction of new retractable bollard array systems and footings, new electrical cabinets, new power pedestal, new stop/go traffic signals/signage, and all appurtenant work and other items not mentioned that are required by the plans and specifications.
Premium
Access the largest public sector contact database
The City of Bloomington, Indiana (Board of Public Works) seeks sealed bids for the Kirkwood Bollard Footing Installation Project to install crash-rated bollard footings and sleeves. Bids are submitted electronically through the City’s OpenGov procurement portal and this is an Invitation for Bid (sealed pricing). The posting includes project plans and forms on the portal and the bid submission deadline is Dec 15, 2025 at 12:00 PM Eastern.
Posted Date
Dec 3, 2025
Due Date
Dec 15, 2025
Release: Dec 3, 2025
Close: Dec 15, 2025
The City of Bloomington, Indiana (Board of Public Works) seeks sealed bids for the Kirkwood Bollard Footing Installation Project to install crash-rated bollard footings and sleeves. Bids are submitted electronically through the City’s OpenGov procurement portal and this is an Invitation for Bid (sealed pricing). The posting includes project plans and forms on the portal and the bid submission deadline is Dec 15, 2025 at 12:00 PM Eastern.
AvailableThe City of Seattle (Seattle Center) is soliciting bids to remove existing perimeter bollards and install owner-provided Gibraltar mechanical and fixed bollards, including sump pump and hydraulic power unit, repairs to concrete/ground finishes, and compliance with anti-terrorism criteria at the Seattle Center campus. Mandatory pre-bid site inspections are scheduled for December 17 and 18, 2025, contractor questions are due January 1, 2026 at 5:00 PM, and bids are to be opened on January 7, 2026 at 2:00 PM (Pacific Time); the engineer's estimate is $650,000. The project requires a 5% bid guaranty, prevailing wage compliance, payment/performance bonds, and Washington State contractor registration (this is a construction solicitation, not a grant).
Posted Date
Dec 10, 2025
Due Date
Jan 7, 2026
Release: Dec 10, 2025
Close: Jan 7, 2026
The City of Seattle (Seattle Center) is soliciting bids to remove existing perimeter bollards and install owner-provided Gibraltar mechanical and fixed bollards, including sump pump and hydraulic power unit, repairs to concrete/ground finishes, and compliance with anti-terrorism criteria at the Seattle Center campus. Mandatory pre-bid site inspections are scheduled for December 17 and 18, 2025, contractor questions are due January 1, 2026 at 5:00 PM, and bids are to be opened on January 7, 2026 at 2:00 PM (Pacific Time); the engineer's estimate is $650,000. The project requires a 5% bid guaranty, prevailing wage compliance, payment/performance bonds, and Washington State contractor registration (this is a construction solicitation, not a grant).
AvailableConstruction of the waterline replacement project.
Posted Date
Dec 5, 2025
Due Date
Dec 30, 2025
Release: Dec 5, 2025
Close: Dec 30, 2025
Construction of the waterline replacement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis