Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The general items of work include, at two locations in the city, the removal of the entire existing retractable bollard array system, the entire footing, all components and conductors, and the construction of new retractable bollard array systems and footings, new electrical cabinets, new power pedestal, new stop/go traffic signals/signage, and all appurtenant work and other items not mentioned that are required by the plans and specifications.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work include, at two locations in the city, the removal of the entire existing retractable bollard array system, the entire footing, all components and conductors, and the construction of new retractable bollard array system and footings, inew electrical cabinets, new power pedestal, new stop/go traffic signals/signage, and all appurtenant work items.
Posted Date
Nov 6, 2025
Due Date
Dec 18, 2025
Release: Nov 6, 2025
Close: Dec 18, 2025
Work include, at two locations in the city, the removal of the entire existing retractable bollard array system, the entire footing, all components and conductors, and the construction of new retractable bollard array system and footings, inew electrical cabinets, new power pedestal, new stop/go traffic signals/signage, and all appurtenant work items.
AvailableThe State of Idaho seeks proposals for the replacement of a chiller and associated systems at the College of Natural Resources, University of Idaho. The project includes removal of an exterior chiller, replacement of the chilled water system, and installation of automatic mixing stations as an alternate option.
Posted Date
-
Due Date
Dec 16, 2025
The State of Idaho seeks proposals for the replacement of a chiller and associated systems at the College of Natural Resources, University of Idaho. The project includes removal of an exterior chiller, replacement of the chilled water system, and installation of automatic mixing stations as an alternate option.
Install 2,548 LF of 8", 6", and 4" ductile iron water main, fittings, and hydrants includes 2,450 LF 8" Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, with 8 mil. V-Bio Enhanced Polyethylene Encasement, installed, 88 LF 6" Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, with 8 mil. V-Bio Enhanced Polyethylene Encasement, installed.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Close: Jan 6, 2026
Install 2,548 LF of 8", 6", and 4" ductile iron water main, fittings, and hydrants includes 2,450 LF 8" Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, with 8 mil. V-Bio Enhanced Polyethylene Encasement, installed, 88 LF 6" Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, with 8 mil. V-Bio Enhanced Polyethylene Encasement, installed.
AvailableReplacement of the existing ultrasonic flowmeter system installed in units 1 to 6 (currently not functioning) at the with a modern ultrasonic flowmeter system, that allows flow measurement accuracy suitable to perform absolute efficiency test per iec/ptc standards. Includes the removal of the existing system and design, supply, installation, calibration and commissioning of new flowmeter systems for all 6 units, in addition to on-site operators training.
Posted Date
Aug 14, 2025
Due Date
Dec 18, 2025
Release: Aug 14, 2025
Close: Dec 18, 2025
Replacement of the existing ultrasonic flowmeter system installed in units 1 to 6 (currently not functioning) at the with a modern ultrasonic flowmeter system, that allows flow measurement accuracy suitable to perform absolute efficiency test per iec/ptc standards. Includes the removal of the existing system and design, supply, installation, calibration and commissioning of new flowmeter systems for all 6 units, in addition to on-site operators training.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis