Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Install 2,548 LF of 8", 6", and 4" ductile iron water main, fittings, and hydrants includes 2,450 LF 8" Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, with 8 mil. V-Bio Enhanced Polyethylene Encasement, installed, 88 LF 6" Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, with 8 mil. V-Bio Enhanced Polyethylene Encasement, installed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The approximate quantities for the principal items of work under this contract are: 1847 LF - 6" c-900, PVC water main; 105 LF - 6" hdpe pipe (dr11) (directional bore); 520 LF - 3/4" service line; 380 LF - 2" PVC encasement (bored); 16 each - water service reconnection (complete in place); 2 each - tie-in to existing water system; 4 each - 6" gate valve with box; 4 each - fire hydrant assembly (complete); 100 lf - saw cut pavement/driveways (variable depth); 125 SY - remove and replace asphalt pavement (crush stone); 100 SY - remove and replace concrete drive; 50 Y - remove and replace concrete sidewalk; 100 SY - remove and replace concrete curb & gutter; 100 SY - borrow excavation (class 9) (fm); 0.25 acres - seeding and mulching; 1 each - 6" tapping sleeve and valve with box; 7 each - tree removal, all sizes.
Posted Date
Aug 1, 2025
Due Date
Jan 13, 2026
Release: Aug 1, 2025
Close:
Premium
Access the largest public sector contact database
The approximate quantities for the principal items of work under this contract are: 1847 LF - 6" c-900, PVC water main; 105 LF - 6" hdpe pipe (dr11) (directional bore); 520 LF - 3/4" service line; 380 LF - 2" PVC encasement (bored); 16 each - water service reconnection (complete in place); 2 each - tie-in to existing water system; 4 each - 6" gate valve with box; 4 each - fire hydrant assembly (complete); 100 lf - saw cut pavement/driveways (variable depth); 125 SY - remove and replace asphalt pavement (crush stone); 100 SY - remove and replace concrete drive; 50 Y - remove and replace concrete sidewalk; 100 SY - remove and replace concrete curb & gutter; 100 SY - borrow excavation (class 9) (fm); 0.25 acres - seeding and mulching; 1 each - 6" tapping sleeve and valve with box; 7 each - tree removal, all sizes.
AvailableProcurement of services for the North Avenue - Bancroft to Higgins Water Main Replacement Project, including the installation of water mains, services, associated fittings, fire hydrants, and restoration work.
Posted Date
Dec 13, 2025
Due Date
Jan 14, 2026
Release: Dec 13, 2025
Close: Jan 14, 2026
Procurement of services for the North Avenue - Bancroft to Higgins Water Main Replacement Project, including the installation of water mains, services, associated fittings, fire hydrants, and restoration work.
AvailableThe City of Missoula is issuing an Invitation to Bid for the North Avenue – Bancroft to Higgins Water Main Replacement Project to replace and install approximately 2,305 LF of 8-inch DIP, 116 LF of 6-inch DIP, and 160 LF of bored 10-inch HDPE water main and associated services, hydrants, valves, and restorations. Contract documents and half-size drawings are available through QuestCDN (project number 9978046) beginning December 13, 2025; bidders must purchase documents via QuestCDN and submit electronic bids through QuestCDN or the City bidding site. Bids are due January 14, 2026 at 2:00 p.m. MST (2026-01-14T21:00:00Z), and a mandatory virtual pre-bid conference is scheduled for January 6, 2026 at 3:00 p.m. MST.
Posted Date
Dec 9, 2025
Due Date
Jan 14, 2026
Release: Dec 9, 2025
Close: Jan 14, 2026
The City of Missoula is issuing an Invitation to Bid for the North Avenue – Bancroft to Higgins Water Main Replacement Project to replace and install approximately 2,305 LF of 8-inch DIP, 116 LF of 6-inch DIP, and 160 LF of bored 10-inch HDPE water main and associated services, hydrants, valves, and restorations. Contract documents and half-size drawings are available through QuestCDN (project number 9978046) beginning December 13, 2025; bidders must purchase documents via QuestCDN and submit electronic bids through QuestCDN or the City bidding site. Bids are due January 14, 2026 at 2:00 p.m. MST (2026-01-14T21:00:00Z), and a mandatory virtual pre-bid conference is scheduled for January 6, 2026 at 3:00 p.m. MST.
AvailableThe State of Idaho seeks proposals for the replacement of a chiller and associated systems at the College of Natural Resources, University of Idaho. The project includes removal of an exterior chiller, replacement of the chilled water system, and installation of automatic mixing stations as an alternate option.
Posted Date
-
Due Date
Dec 16, 2025
The State of Idaho seeks proposals for the replacement of a chiller and associated systems at the College of Natural Resources, University of Idaho. The project includes removal of an exterior chiller, replacement of the chilled water system, and installation of automatic mixing stations as an alternate option.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.