Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of the existing ultrasonic flowmeter system installed in units 1 to 6 (currently not functioning) at the with a modern ultrasonic flowmeter system, that allows flow measurement accuracy suitable to perform absolute efficiency test per iec/ptc standards. Includes the removal of the existing system and design, supply, installation, calibration and commissioning of new flowmeter systems for all 6 units, in addition to on-site operators training.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
The project includes new construction of an approx. 126,000 SF building to serve as the replacement for the elementary school. Sitework included in this project will include connections & adjustments to site utilities, asphalt paving, curb & gutter and concrete sidewalks.
Posted Date
Oct 31, 2025
Due Date
Dec 16, 2025
Release: Oct 31, 2025
Close: Dec 16, 2025
The project includes new construction of an approx. 126,000 SF building to serve as the replacement for the elementary school. Sitework included in this project will include connections & adjustments to site utilities, asphalt paving, curb & gutter and concrete sidewalks.
AvailableWork includes hydraulic elevator replacement.
Posted Date
Aug 15, 2025
Due Date
Dec 17, 2025
Release: Aug 15, 2025
Close: Dec 17, 2025
Work includes hydraulic elevator replacement.
AvailableThe State of Idaho seeks proposals for the replacement of a chiller and associated systems at the College of Natural Resources, University of Idaho. The project includes removal of an exterior chiller, replacement of the chilled water system, and installation of automatic mixing stations as an alternate option.
Posted Date
-
Due Date
Dec 16, 2025
The State of Idaho seeks proposals for the replacement of a chiller and associated systems at the College of Natural Resources, University of Idaho. The project includes removal of an exterior chiller, replacement of the chilled water system, and installation of automatic mixing stations as an alternate option.
AvailableInstall 2,548 LF of 8", 6", and 4" ductile iron water main, fittings, and hydrants includes 2,450 LF 8" Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, with 8 mil. V-Bio Enhanced Polyethylene Encasement, installed, 88 LF 6" Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, with 8 mil. V-Bio Enhanced Polyethylene Encasement, installed.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Close: Jan 6, 2026
Install 2,548 LF of 8", 6", and 4" ductile iron water main, fittings, and hydrants includes 2,450 LF 8" Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, with 8 mil. V-Bio Enhanced Polyethylene Encasement, installed, 88 LF 6" Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, with 8 mil. V-Bio Enhanced Polyethylene Encasement, installed.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis