Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seattle School District No. 1 (Seattle Public Schools) requests proposals to furnish and install network equipment, cabling, licenses, and management software across approximately 95 schools and facilities as a turnkey solution. The project replaces existing network switches and includes installation, configuration, basic testing, and coordination to meet project goals under the BEX V levy. Proposals are due January 8, 2026 at 10:00 a.m. PST, with RFP documents available via the Builders Exchange of Washington starting November 19, 2025.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Seattle Public Schools seeks a GC/CM to provide preconstruction and construction services for the Bryant Elementary School Windows Improvements project funded by the BEX V and BTA V capital levies. The scope includes exterior faade repairs and cleaning, wood window repairs, and replacement of failing aluminum-clad wood windows with associated moisture-intrusion wall repairs. A virtual pre-proposal meeting and an on-site visit are scheduled for December 17, and proposals are due January 20, 2026 at 10:00 a.m. PST.
Posted Date
Dec 5, 2025
Due Date
Jan 20, 2026
Premium
Access the largest public sector contact database
Seattle Public Schools seeks a GC/CM to provide preconstruction and construction services for the Bryant Elementary School Windows Improvements project funded by the BEX V and BTA V capital levies. The scope includes exterior faade repairs and cleaning, wood window repairs, and replacement of failing aluminum-clad wood windows with associated moisture-intrusion wall repairs. A virtual pre-proposal meeting and an on-site visit are scheduled for December 17, and proposals are due January 20, 2026 at 10:00 a.m. PST.
AvailableThe City of Seattle (Seattle Center) is soliciting bids to remove existing perimeter bollards and install owner-provided Gibraltar mechanical and fixed bollards, including sump pump and hydraulic power unit, repairs to concrete/ground finishes, and compliance with anti-terrorism criteria at the Seattle Center campus. Mandatory pre-bid site inspections are scheduled for December 17 and 18, 2025, contractor questions are due January 1, 2026 at 5:00 PM, and bids are to be opened on January 7, 2026 at 2:00 PM (Pacific Time); the engineer's estimate is $650,000. The project requires a 5% bid guaranty, prevailing wage compliance, payment/performance bonds, and Washington State contractor registration (this is a construction solicitation, not a grant).
Posted Date
Dec 10, 2025
Due Date
Jan 7, 2026
Release: Dec 10, 2025
Close: Jan 7, 2026
The City of Seattle (Seattle Center) is soliciting bids to remove existing perimeter bollards and install owner-provided Gibraltar mechanical and fixed bollards, including sump pump and hydraulic power unit, repairs to concrete/ground finishes, and compliance with anti-terrorism criteria at the Seattle Center campus. Mandatory pre-bid site inspections are scheduled for December 17 and 18, 2025, contractor questions are due January 1, 2026 at 5:00 PM, and bids are to be opened on January 7, 2026 at 2:00 PM (Pacific Time); the engineer's estimate is $650,000. The project requires a 5% bid guaranty, prevailing wage compliance, payment/performance bonds, and Washington State contractor registration (this is a construction solicitation, not a grant).
AvailableThe project requires the procurement of new switch modules for the core network switch and complete replacement of the edge network switches.
Posted Date
Nov 10, 2025
Due Date
Dec 16, 2025
Release: Nov 10, 2025
Close: Dec 16, 2025
The project requires the procurement of new switch modules for the core network switch and complete replacement of the edge network switches.
AvailableNetwork switch refresh.
Posted Date
Oct 29, 2025
Due Date
Dec 16, 2025
Release: Oct 29, 2025
Close: Dec 16, 2025
Network switch refresh.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis