CityNC
Posted
Jun 3, 2026
Oct 8, 2026
Safe Streets for All (SS4A) Phase 1
Work includes approx 2,694 SY 0.0" to 3.0" milling asphalt pavement; 379 LF 2' 6" concrete curb and gutter; 75 SY 6" concrete sidewalk or pad; 2,831 LF 8" thermoplastic pavement markings lines; 4,580 LF type 1 lead in cable (two pair) modified 1726; 685 LF aerial fiber optic cable assembly unit.
