Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
758 CY road and drainage excavation (unclassified); 24 CY placing and spreading topsoil; 1,250 LF saw cutting pavement; 123 LF of 15" conc pipe culv, cl III; 1 LS traffic control; 155 SF signs (construction); 70 LF plastic pav marking, stop line; 1 Ea electrical service connection. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Highway Pedestrian Safety Improvements - Various Locations.
Posted Date
Dec 15, 2025
Due Date
Jan 22, 2026
Release: Dec 15, 2025
Close: Jan 22, 2026
Highway Pedestrian Safety Improvements - Various Locations.
AvailableThe City of Canton requires design and engineering services for the Hickory Flat Highway Gateway Concept Plan Transportation Improvements Project, encompassing vehicular bridge replacement, three new roundabouts, road realignment and widening, and pedestrian and bicyclist improvements.
Posted Date
Dec 18, 2025
Due Date
Jan 29, 2026
Release: Dec 18, 2025
Close: Jan 29, 2026
The City of Canton requires design and engineering services for the Hickory Flat Highway Gateway Concept Plan Transportation Improvements Project, encompassing vehicular bridge replacement, three new roundabouts, road realignment and widening, and pedestrian and bicyclist improvements.
AvailableProcurement of contractors for the installation of approximately 350 feet of 6-inch steel, 350 feet of 4-inch PE, and 625 feet of 2-inch PE natural gas lines at Sugarloaf Parkway and Old Snellville Highway.
Posted Date
Dec 8, 2025
Due Date
Jan 14, 2026
Release: Dec 8, 2025
Close: Jan 14, 2026
Procurement of contractors for the installation of approximately 350 feet of 6-inch steel, 350 feet of 4-inch PE, and 625 feet of 2-inch PE natural gas lines at Sugarloaf Parkway and Old Snellville Highway.
AvailableWork includes approx 200 CY excavation and repair of soft spots; 45,000 SY cement recycled asphalt base stabilization; 424 LF 18" pipe culvert. See outside link.
Posted Date
Dec 22, 2025
Due Date
Jan 13, 2026
Release: Dec 22, 2025
Close: Jan 13, 2026
Work includes approx 200 CY excavation and repair of soft spots; 45,000 SY cement recycled asphalt base stabilization; 424 LF 18" pipe culvert. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis