Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of contractors for the installation of approximately 350 feet of 6-inch steel, 350 feet of 4-inch PE, and 625 feet of 2-inch PE natural gas lines at Sugarloaf Parkway and Old Snellville Highway.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Installing approx. 350 LF of 6" steel, 350 LF of 4" PE, and 625 LF of 2" PE. Install approx. 350 LF of 6" steel and 350 LF of 4" PE. Two steel main tap and stops with tie overs. Two PE main tie-overs. Will require open trenching and boring. Install approximately 625 LF of 2" PE. One service tie-over and two main tie-overs. Will require open trenching and boring.
Posted Date
Dec 9, 2025
Due Date
Jan 14, 2026
Release: Dec 9, 2025
Close: Jan 14, 2026
Installing approx. 350 LF of 6" steel, 350 LF of 4" PE, and 625 LF of 2" PE. Install approx. 350 LF of 6" steel and 350 LF of 4" PE. Two steel main tap and stops with tie overs. Two PE main tie-overs. Will require open trenching and boring. Install approximately 625 LF of 2" PE. One service tie-over and two main tie-overs. Will require open trenching and boring.
Premium
Access the largest public sector contact database
City of Hampton ITB for construction of pedestrian improvements on Old Buckroe Road: installation of hydraulic cement sidewalk (~1,670 SY), ADA curb ramps (14 EA), curb & gutter (~550 LF), driveway replacement, storm pipe work and associated traffic control and erosion control. Federally funded VDOT/ TAP project requiring VDOT prequalification and Virginia contractor registration; DBE goal 0%. Contract terms: 180 calendar days, 100% performance and payment bonds, 5% bid security, sealed hard-copy submission required, contractor license to be provided upon Notice of Intent to Award.
Posted Date
Nov 25, 2025
Due Date
Dec 30, 2025
Release: Nov 25, 2025
Close: Dec 30, 2025
City of Hampton ITB for construction of pedestrian improvements on Old Buckroe Road: installation of hydraulic cement sidewalk (~1,670 SY), ADA curb ramps (14 EA), curb & gutter (~550 LF), driveway replacement, storm pipe work and associated traffic control and erosion control. Federally funded VDOT/ TAP project requiring VDOT prequalification and Virginia contractor registration; DBE goal 0%. Contract terms: 180 calendar days, 100% performance and payment bonds, 5% bid security, sealed hard-copy submission required, contractor license to be provided upon Notice of Intent to Award.
AvailableRepair and resurfacing of Chapel Road (N. Paradise Road to Bulle Rock Parkway) and Old Robinhood Road.
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
Repair and resurfacing of Chapel Road (N. Paradise Road to Bulle Rock Parkway) and Old Robinhood Road.
AvailableRepair and resurfacing of Chapel Road (N. Paradise Road to Bulle Rock Parkway) and Old Robinhood Road.
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
Repair and resurfacing of Chapel Road (N. Paradise Road to Bulle Rock Parkway) and Old Robinhood Road.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis