Open RFP

Runway 18L/36R Tunnel Rehabilitation & Safety Improvements

Description: Project includes rehabilitation and safety improvements to the south airfield drive tunnel beneath runway 18l/36r at cvg. Work consists of concrete slab, wall, and soffit repairs, expansion joint and sealant replacement, slab waterproofing, ventilation roof slab infill, pavement and sidewalk replacement, drainage and storm sewer improvements, and striping and signage replacement; upgrading the tunnel lighting to new led fixtures with a new lighting control system; replacing the existing electrical distribution, panelboards, feeders, and wiring along with emergency power upgrades; replacing the existing ventilation fans with new tunnel exhaust fans, new unit heaters and controls; and upgrades to the fire protection, fire alarm, security, and technology systems for this project.

Released
Aug 13, 2026
Closes
Sep 3, 2026(17 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts