4173 - Phillips/TH55 Tunnel Rehabilitation Project
Works include approx. 3,800 LF of type 1: crack seal (base); 4,058 LF of type 5: concrete joint repair (base); 2,200 EA contract grout hole (base).
Description: The scope of work for this contract includes rehabilitation of approx. 430 LF of varied dimension/shape tunnel sewer. Rehabilitation methods include leak elimination via grout injection, application of a cementitious grout or mortar to surface, and installation of CIPP liner.
SpecialDistrict · KY, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityMN
Aug 5, 2026
Closes
Aug 26, 2026
Works include approx. 3,800 LF of type 1: crack seal (base); 4,058 LF of type 5: concrete joint repair (base); 2,200 EA contract grout hole (base).
Higher EducationOH
Jul 28, 2026
Closes
Aug 20, 2026
project consists of the removal and replacement of the roof, removal of abandoned utilities, and the inspection and patching of tunnels. Project will also construct new steam and condensate and chilled water supply and return lines.
Northeast Ohio Regional Sewer District
Special DistrictOH
Apr 7, 2026
Closes
Aug 27, 2026
General, the work shall consist of furnishing all labor, materials, equipment, and incidentals for construction of the following work: construct the STDPS on the mining site of the Southerly tunnel after the tunnel contractor demobilizes from that site. Complete the build-out of the mining shaft to serve as the pump station's wet well. Construct an at-grade building above the wet well to house the pump station's support systems. Connect the pump station's discharge to an existing flow drop structure. Complete the construction and outfitting of facilities remote from STDPS that were constructed under the Southerly Tunnel and consolidation (SOTC) and Kingsbury run consolidation sewer (KRCS) projects; some of NEORSD's existing facilities that predate these projects also require modification. Commission the Southerly Tunnel system and turn over a fully functional system to the NEORSD.
Connecticut Department of Transportation
State AgencyCT
Jul 24, 2026
Closes
Oct 24, 2026
The Connecticut Department of Transportation (CTDOT) is seeking qualifications from a Construction Manager/General Contractor (CM/GC) for preconstruction services and the construction phase of the Heroes Tunnel Rehabilitation and Route 15 Interchange 46 Improvements project. This CM/GC procurement covers State Project Nos. 0167-0108 and 0092-0689, located in the Towns of Woodbridge and Hamden and the City of New Haven, CT. Responses are due October 24, 2026, with detailed information accessible through the CT State Contracting Portal (CTSource).