Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Largo is soliciting bids for the Rosery Rd NE Mobility Improvements project involving roadway construction, including asphaltic and non-asphaltic materials, general construction/maintenance and roadside services. Bid documents include plans, specifications, measurement and payment details and are available for download from the official posting. The solicitation is an Invitation for Bid with a bid opening/close deadline of January 7, 2026 and is not a grant program.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
New stormwater facilities (conveyance pipe, drainage structures and swales), curb, gutter and sidewalk, shared use path, utilities, paving, illumination, a traffic signal and restoration. All work shall be completed in accordance with the contract plans, special provisions, and approved standard specifications.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
New stormwater facilities (conveyance pipe, drainage structures and swales), curb, gutter and sidewalk, shared use path, utilities, paving, illumination, a traffic signal and restoration. All work shall be completed in accordance with the contract plans, special provisions, and approved standard specifications.
AvailablePremium
Access the largest public sector contact database
The City of Gainesville is soliciting proposals from licensed contractors to provide Construction Manager at Risk (CMAR) services for the redevelopment of the NE 8th Avenue at Waldo Rd site, which currently houses the Martin Luther King Multi-Purpose Center, the Dwight Hunter Pool Complex, and Citizens Field. The CMAR will assist during preconstruction with design, constructability, cost estimation, scheduling, and will develop a Guaranteed Maximum Price (GMP) for construction; if the GMP is accepted, construction will proceed under a separate contract. The anticipated contract start date is July 1, 2026, with an estimated award date of May 7, 2026; the solicitation estimates a project value between $5,000,000 and $15,000,000.
Posted Date
Dec 10, 2025
Due Date
Feb 4, 2026
Release: Dec 10, 2025
Close: Feb 4, 2026
The City of Gainesville is soliciting proposals from licensed contractors to provide Construction Manager at Risk (CMAR) services for the redevelopment of the NE 8th Avenue at Waldo Rd site, which currently houses the Martin Luther King Multi-Purpose Center, the Dwight Hunter Pool Complex, and Citizens Field. The CMAR will assist during preconstruction with design, constructability, cost estimation, scheduling, and will develop a Guaranteed Maximum Price (GMP) for construction; if the GMP is accepted, construction will proceed under a separate contract. The anticipated contract start date is July 1, 2026, with an estimated award date of May 7, 2026; the solicitation estimates a project value between $5,000,000 and $15,000,000.
The City of Gainesville is soliciting proposals from licensed contractors to provide Construction Manager at Risk (CMAR) services for the redevelopment of the NE 8th Avenue at Waldo Rd site, which currently houses the Martin Luther King Multi-Purpose Center, the Dwight Hunter Pool Complex, and Citizens Field. The CMAR will assist during preconstruction with design, constructability, cost estimation, scheduling, and will develop a Guaranteed Maximum Price (GMP) for construction; if the GMP is accepted, construction will proceed under a separate contract. The anticipated contract start date is July 1, 2026, with an estimated award date of May 7, 2026; the solicitation estimates a project value between $5,000,000 and $15,000,000.
Posted Date
Dec 10, 2025
Due Date
Feb 4, 2026
Release: Dec 10, 2025
Close: Feb 4, 2026
The City of Gainesville is soliciting proposals from licensed contractors to provide Construction Manager at Risk (CMAR) services for the redevelopment of the NE 8th Avenue at Waldo Rd site, which currently houses the Martin Luther King Multi-Purpose Center, the Dwight Hunter Pool Complex, and Citizens Field. The CMAR will assist during preconstruction with design, constructability, cost estimation, scheduling, and will develop a Guaranteed Maximum Price (GMP) for construction; if the GMP is accepted, construction will proceed under a separate contract. The anticipated contract start date is July 1, 2026, with an estimated award date of May 7, 2026; the solicitation estimates a project value between $5,000,000 and $15,000,000.
The work includes approx 9,055.9 SY removal of asphalt pavement; 4,495 SY general excavation; 80 LF SY 24" RCP cross drain pipe; 56 LF 42" RCP storm drain pipe; 174 LF 4" width 4' length temporary pavement markings.
Posted Date
Nov 20, 2025
Due Date
Dec 16, 2025
Release: Nov 20, 2025
Close: Dec 16, 2025
The work includes approx 9,055.9 SY removal of asphalt pavement; 4,495 SY general excavation; 80 LF SY 24" RCP cross drain pipe; 56 LF 42" RCP storm drain pipe; 174 LF 4" width 4' length temporary pavement markings.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis