Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Blackstock rd & mt. Zion rd at new cut road intersection improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Construction of the City - Road Intersection Improvements will be received by City.
Posted Date
Dec 16, 2025
Due Date
Jan 13, 2026
Release: Dec 16, 2025
Close: Jan 13, 2026
The Construction of the City - Road Intersection Improvements will be received by City.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Heber City is soliciting sealed bids for construction of intersection improvements at 980 South Mill Road to improve traffic flow and pedestrian safety, including removal/installation of asphalt, curb, gutter, sidewalks, pedestrian ramps, traffic calming measures and pedestrian crossing systems. A pre‑bid conference is scheduled for 10:00 a.m. MST on January 6, 2026 at Heber City offices; questions are due to Alex White by January 8, 2026 at 2:00 PM. Sealed bids will be received at Heber City (75 North Main, Heber, Utah) until 2:00 p.m. MST, January 13, 2026.
Posted Date
Dec 16, 2025
Due Date
Jan 13, 2026
Release: Dec 16, 2025
Close: Jan 13, 2026
Heber City is soliciting sealed bids for construction of intersection improvements at 980 South Mill Road to improve traffic flow and pedestrian safety, including removal/installation of asphalt, curb, gutter, sidewalks, pedestrian ramps, traffic calming measures and pedestrian crossing systems. A pre‑bid conference is scheduled for 10:00 a.m. MST on January 6, 2026 at Heber City offices; questions are due to Alex White by January 8, 2026 at 2:00 PM. Sealed bids will be received at Heber City (75 North Main, Heber, Utah) until 2:00 p.m. MST, January 13, 2026.
AvailableConstruction of intersection improvements at 980 South Mill Road, Heber City, Utah. This includes removal of existing asphalt, curb and gutter, and sidewalk; installation of new curb and gutter, sidewalk improvements, and pedestrian crossing infrastructure; traffic calming measures; and re-striping of crosswalks, driving, and bike lanes.
Posted Date
Dec 13, 2025
Due Date
Jan 13, 2026
Release: Dec 13, 2025
Close: Jan 13, 2026
Construction of intersection improvements at 980 South Mill Road, Heber City, Utah. This includes removal of existing asphalt, curb and gutter, and sidewalk; installation of new curb and gutter, sidewalk improvements, and pedestrian crossing infrastructure; traffic calming measures; and re-striping of crosswalks, driving, and bike lanes.
AvailableWork includes three (3) new ten (10) foot pedestrian signal poles, two (2) new pedestrian signals, eight (8) audible pedestrian systems, upgraded pedestrian signage, the installation of a new signal cabinet and controller with new electrical services, approx two hundred (200) LF of conduit, a junction box, and a copper wire loop detector, consist of removal and installation of thermoplastic pavement marking and striping, including the realignment of one (1) existing crosswalk and the addition of one (1) crosswalk.
Posted Date
Dec 30, 2025
Due Date
Jan 21, 2026
Release: Dec 30, 2025
Close: Jan 21, 2026
Work includes three (3) new ten (10) foot pedestrian signal poles, two (2) new pedestrian signals, eight (8) audible pedestrian systems, upgraded pedestrian signage, the installation of a new signal cabinet and controller with new electrical services, approx two hundred (200) LF of conduit, a junction box, and a copper wire loop detector, consist of removal and installation of thermoplastic pavement marking and striping, including the realignment of one (1) existing crosswalk and the addition of one (1) crosswalk.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →