Alabama Department of Transportation
Special DistrictAL
Posted
Aug 1, 2026
Sep 25, 2026
Bridge Replacement and Approaches (Grading, Drainage, Pavement, Intelligent Traffic Systems (ITS), Traffic Signals, and Traffic Stripe)
Work includes approx 66,931 CY borrow excavation; 58,710 SY micro-milling existing pavement; 1 LS brdge concrete superstructure; 17,461 SY grooving concrete bridge decks; 3,378 LF 18" roadway pipe (class 3 RC); 1,384 LF 18" storm sewer pipe (class 3 RC); 248 LF 24" roadway pipe rehabilitation.