Alabama Department of Transportation
Special DistrictAL
Posted
Aug 28, 2026
Sep 25, 2026
Roadway Improvements/Additional Lanes (Grading, Drainage, Pavement, Bridge, and Traffic Signs) RFP
Work includes clearing and grubbing, removal of old bridge, removal of old box culvert, 1,049 SY removing concrete driveway, 1,643 LF removing pipe, 526 LF removing guardrail, 1,858 LF removing curb, 1,216 LF removing curb and gutter, 1,703 LF removing concrete flume, 4,999 LF removing fence, 12 EA removing headwalls, 14 EA removing inlets, removing junction boxes, 8 EA removing guardrail end anchor, 60,052 CY unclassified excavation, 5,200 CY muck excavation, 228 rbst roadbed processing, 2,300 SY geosynthetic reinforcement for soft soil stabilization, type 2, 118,514 SY crushed aggregate base course, type b, road mixed, 6" compacted thickness. See attached file.