Roadway Improvements/Additional Through Lane (Grading, Drainage, Pavement, and Traffic Signal Modifications) RFP
Work includes clearing and grubbing, 270 SY removing concrete slope paving, 14 SY removing concrete flumes, 93 SY removing concrete driveway, 198 LF removing curb, 393 LF removing curb and gutter, 330 LF removing gutter, 1 EA removing headwalls, 6,474 CY unclassified excavation, 4,175 CY borrow excavation (loose truckbed measurement)(a4 or better), 5 CY structure excavation, 2 CY foundation backfill, commercial, 39 rbst roadbed processing, 8,300 SY crushed aggregate base course, type b, road mixed, 6" compacted thickness, 200 Ton crushed aggregate, section 825, type b, 8,300 SY bituminous treatment a, 24,200 SY micro-milling existing pavement (approx 1.10" thru 2.00" thick). See attached file.