Summary
Reconstruction of river road to a 4-lane facility. This project includes new sidewalks, a new multi-use path, and a new light. 20 LF of standard curb and gutter modifications; 19,081LF of standard integral curb; 2,018 LF of 6' chain link fence; 179 Ton asphalt pavement milling and texturing; 3,055 SY of 4" concrete sidewalk; 2 EA 4" PVC pipe; 2,706 SY of erosion control blanket; pavement markings; 1,199 LF of sawcut pavement; 60 EA bollards; 4,981 LF of 15" storm sewer pipe; 1,557 LF of 18" storm sewer pipe; 7 EA bypass manhole; 4,641 LF of trenching and back filling; 60 LF of waterline encasement steel bored ranges; 6 EA fire hydrant assembly; 4,200 LF of 12" ductile iron waterline pipe; 60 LF of 24" welded steel waterline casing pipe. See attached files.