CityWA
Aug 14, 2026
Closes
Sep 15, 2026
Mojonnier Road Transmission Main Phase 2 RFP
Work includes the installation of a 16" diameter water transmission main beginning at the city's future reservoir No. 4 site near the city's WWTP. A second section of water main will be installed along Teal Lane beginning and continuing south approx., 1,500'. The total length of main water installation is approx., 7,900'. In addition, approx., 1,400 LF of 8" gravity sewer main.