Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Revitalizing rail track.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Conduct a thorough evaluation of all existing rail assets, including to track conditions, crossings, signals, ties, switches, and supporting infrastructure at BPIC; produce an inventory of existing rail track categorized by condition; create a master rail lead track map using a color-coded system that indicates track conditions for potential future rail development; identify and assess opportunities for expansion to accommodate existing and future tenants; consider previous rail locations within BPIC and the potential for replacement rail projects; evaluate multimodal connections, including integration with barge operations, existing loading docks, truck facilities, and future freight infrastructure; provide design and engineering recommendations for new tracks, crossings, and supporting infrastructure; provide preliminary cost estimates for individual projects and a budget for all proposed new rail construction; and identify potential funding opportunities, including state and federal sources.
Posted Date
Dec 17, 2025
Due Date
Jan 23, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 23, 2026
Conduct a thorough evaluation of all existing rail assets, including to track conditions, crossings, signals, ties, switches, and supporting infrastructure at BPIC; produce an inventory of existing rail track categorized by condition; create a master rail lead track map using a color-coded system that indicates track conditions for potential future rail development; identify and assess opportunities for expansion to accommodate existing and future tenants; consider previous rail locations within BPIC and the potential for replacement rail projects; evaluate multimodal connections, including integration with barge operations, existing loading docks, truck facilities, and future freight infrastructure; provide design and engineering recommendations for new tracks, crossings, and supporting infrastructure; provide preliminary cost estimates for individual projects and a budget for all proposed new rail construction; and identify potential funding opportunities, including state and federal sources.
AvailableThe scope of this project is to provide opportunity to gain rail efficiency and expand railcar capacity at the municipal river terminal includes 106 LF saw cut pavement for easy tie-in and removal, 638 SY remove asphalt pavement (2 places), 1,950 CY compacted embankment in-place from excavation, 54 LF furnish and install 3-18" dia. polymer coated 12 ga CSP culverts.
Posted Date
Nov 27, 2025
Due Date
Jan 6, 2026
Release: Nov 27, 2025
Close: Jan 6, 2026
The scope of this project is to provide opportunity to gain rail efficiency and expand railcar capacity at the municipal river terminal includes 106 LF saw cut pavement for easy tie-in and removal, 638 SY remove asphalt pavement (2 places), 1,950 CY compacted embankment in-place from excavation, 54 LF furnish and install 3-18" dia. polymer coated 12 ga CSP culverts.
AvailableThe Port of Corpus Christi issued a bid (RFB 25-041A) for Rincon Rail Improvements. The project involves removing existing 90 lb rail and replacing it with new 115 lb rail, constructing a new transloading track, and extending four existing tracks. Contractors are expected to provide all labor, materials, and equipment for this lump-sum bid.
Posted Date
Dec 12, 2025
Due Date
Dec 31, 2025
Release: Dec 12, 2025
Close: Dec 31, 2025
The Port of Corpus Christi issued a bid (RFB 25-041A) for Rincon Rail Improvements. The project involves removing existing 90 lb rail and replacing it with new 115 lb rail, constructing a new transloading track, and extending four existing tracks. Contractors are expected to provide all labor, materials, and equipment for this lump-sum bid.
Perform wayside clearing, installing standard rail fasteners on the Authority's East, North, Northeast, and South Rail Lines, and the disposal of replaced track materials.
Posted Date
Nov 12, 2025
Due Date
Jan 6, 2026
Release: Nov 12, 2025
Close: Jan 6, 2026
Perform wayside clearing, installing standard rail fasteners on the Authority's East, North, Northeast, and South Rail Lines, and the disposal of replaced track materials.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →