Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Conduct a thorough evaluation of all existing rail assets, including to track conditions, crossings, signals, ties, switches, and supporting infrastructure at BPIC; produce an inventory of existing rail track categorized by condition; create a master rail lead track map using a color-coded system that indicates track conditions for potential future rail development; identify and assess opportunities for expansion to accommodate existing and future tenants; consider previous rail locations within BPIC and the potential for replacement rail projects; evaluate multimodal connections, including integration with barge operations, existing loading docks, truck facilities, and future freight infrastructure; provide design and engineering recommendations for new tracks, crossings, and supporting infrastructure; provide preliminary cost estimates for individual projects and a budget for all proposed new rail construction; and identify potential funding opportunities, including state and federal sources.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Perform a comprehensive facility condition assessment (FCA) of eight warehouses located at the Big Pasco Industrial Center (BPIC). Assessments will inform the port's capital planning and maintenance strategies, providing a clear roadmap for the long-term viability of critical assets including: Mechanical systems; structural integrity; electrical systems; plumbing; HVAC and heating; ventilation systems; fire suppression; building envelope; roofing; and foundation.
Posted Date
Dec 17, 2025
Due Date
Jan 30, 2026
Release: Dec 17, 2025
Close: Jan 30, 2026
Perform a comprehensive facility condition assessment (FCA) of eight warehouses located at the Big Pasco Industrial Center (BPIC). Assessments will inform the port's capital planning and maintenance strategies, providing a clear roadmap for the long-term viability of critical assets including: Mechanical systems; structural integrity; electrical systems; plumbing; HVAC and heating; ventilation systems; fire suppression; building envelope; roofing; and foundation.
AvailableThe intent of this Request for Qualifications (RFQ) is to find and secure an agreement with experienced and qualified Firms, or Teams consisting of more than one Firm providing support services to the lead Firm, capable of providing environmental impact services. The term Firm may represent either a singular Firm, or a Team if the respondent represents multiple Firms.
Posted Date
Dec 3, 2025
Due Date
Jan 5, 2026
Release: Dec 3, 2025
Close: Jan 5, 2026
The intent of this Request for Qualifications (RFQ) is to find and secure an agreement with experienced and qualified Firms, or Teams consisting of more than one Firm providing support services to the lead Firm, capable of providing environmental impact services. The term Firm may represent either a singular Firm, or a Team if the respondent represents multiple Firms.
Residential lead hazard control. Types: Lead Remediation / Mitigation (approx. 70 units) and Lead Abatement (approx. 30 units).
Posted Date
Dec 11, 2025
Due Date
Jan 18, 2026
Release: Dec 11, 2025
Close: Jan 18, 2026
Residential lead hazard control. Types: Lead Remediation / Mitigation (approx. 70 units) and Lead Abatement (approx. 30 units).
AvailableProfessional emergency structural condition assessment services, as needed. The city occasionally requires performance of built structural demolition services on an emergency basis to effectively manage and mitigate risks to the public safety, health, welfare, and/or property.
Posted Date
Dec 19, 2025
Due Date
Jan 29, 2026
Release: Dec 19, 2025
Close: Jan 29, 2026
Professional emergency structural condition assessment services, as needed. The city occasionally requires performance of built structural demolition services on an emergency basis to effectively manage and mitigate risks to the public safety, health, welfare, and/or property.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis