Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The scope of this project is to provide opportunity to gain rail efficiency and expand railcar capacity at the municipal river terminal includes 106 LF saw cut pavement for easy tie-in and removal, 638 SY remove asphalt pavement (2 places), 1,950 CY compacted embankment in-place from excavation, 54 LF furnish and install 3-18" dia. polymer coated 12 ga CSP culverts.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Revitalizing rail track.
Posted Date
Dec 23, 2025
Due Date
Jan 3, 2026
Release: Dec 23, 2025
Close: Jan 3, 2026
Revitalizing rail track.
AvailableConduct a thorough evaluation of all existing rail assets, including to track conditions, crossings, signals, ties, switches, and supporting infrastructure at BPIC; produce an inventory of existing rail track categorized by condition; create a master rail lead track map using a color-coded system that indicates track conditions for potential future rail development; identify and assess opportunities for expansion to accommodate existing and future tenants; consider previous rail locations within BPIC and the potential for replacement rail projects; evaluate multimodal connections, including integration with barge operations, existing loading docks, truck facilities, and future freight infrastructure; provide design and engineering recommendations for new tracks, crossings, and supporting infrastructure; provide preliminary cost estimates for individual projects and a budget for all proposed new rail construction; and identify potential funding opportunities, including state and federal sources.
Posted Date
Dec 17, 2025
Due Date
Jan 23, 2026
Release: Dec 17, 2025
Close: Jan 23, 2026
Conduct a thorough evaluation of all existing rail assets, including to track conditions, crossings, signals, ties, switches, and supporting infrastructure at BPIC; produce an inventory of existing rail track categorized by condition; create a master rail lead track map using a color-coded system that indicates track conditions for potential future rail development; identify and assess opportunities for expansion to accommodate existing and future tenants; consider previous rail locations within BPIC and the potential for replacement rail projects; evaluate multimodal connections, including integration with barge operations, existing loading docks, truck facilities, and future freight infrastructure; provide design and engineering recommendations for new tracks, crossings, and supporting infrastructure; provide preliminary cost estimates for individual projects and a budget for all proposed new rail construction; and identify potential funding opportunities, including state and federal sources.
AvailableWork includes se wellfield expansion.
Posted Date
Dec 19, 2025
Due Date
Feb 3, 2026
Release: Dec 19, 2025
Close: Feb 3, 2026
Work includes se wellfield expansion.
AvailableSouth apron expansion - phase 2 paving.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
South apron expansion - phase 2 paving.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis