Indiana University Bloomington
Higher EducationIN
Posted
Sep 25, 2026
Oct 26, 2026
Description: UC Berkeley seeks environmental planning consultants for statements of qualifications to prepare environmental documents (EIR, IS/MND, or Addendum) and a Mitigation Monitoring and Reporting Program for the California Memorial Stadium Capacity Events project.
HigherEducation · CA, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Indiana University Bloomington
Higher EducationIN
Posted
Sep 25, 2026
Oct 26, 2026
CountySC
Posted
Sep 1, 2026
Oct 8, 2026
Requesting statements and qualifications from qualified environmental consulting firms to provide professional environmental services in support of the county's epa brownfields grant program.
CityWA
Posted
Sep 28, 2026
Oct 29, 2026
The scope of work includes the design, installation, testing, and commissioning of a new fully automated irrigation system serving all greens, tees, fairways, roughs, and landscape areas. The project will incorporate modern central irrigation controls, high-efficiency sprinkler heads, new main line and lateral piping, isolation valves, quick couplers, weather-based scheduling, and flow management technologies to optimize water usage. The complete project will provide reliable, energy-efficiency, and water-conserving irrigation system that supports healthy turf conditions, reduces maintenance cost, and preserves the character of the historic golf course while meeting current environmental standards. Also, the study of use of water retainage lagoons and wells will be part of the project scope the golf course irrigation system project design will comprise of three parts: mechanical, electrical and plumbing. The mechanical part will require- pumps, valves, control lines, sprinkler heads, fertigation injectors. The electrical part will comprise of control panels/central controller, relays and solenoid valves, sensors wiring and conduct. The plumbing will comprise of all piping, main supply lines.
Indiana University Bloomington
Higher EducationIN
Posted
Oct 23, 2026
Oct 8, 2026
Work include renovation and new construction, are focused on targeted enhancements on the west side of memorial stadium for an improved fan experience at the public concourses this side, including west side restrooms, concessions, improved accessibility, circulation, and site improvements to create an enhanced entry experience. New construction will encompass the construction of four new restroom/concession buildings as part of an enlarged concourse at the main level. Renovation work will encompass upgrades and improvements to existing restroom buildings on the west side at both the main and upper concourses.
Decision makers connected to this RFP from University Of California Berkeley.