CityTX
Jul 22, 2026
Closes
Aug 24, 2026
Gilleland Creek Wastewater Interceptor - Request for Proposals
Work consists of replacing approx 2700 LF of the existing 12" wastewater line with a 18" line to meet projected peak flows.
Description: The City of Austin is requesting Statements of Qualifications for Professional Engineering services for the Gilleland Wastewater Interceptor (Coomer Path Lift Station Gravity Relief) project.
City · TX, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityTX
Jul 22, 2026
Closes
Aug 24, 2026
Work consists of replacing approx 2700 LF of the existing 12" wastewater line with a 18" line to meet projected peak flows.
CityID
Jul 15, 2026
Closes
Sep 4, 2026
Work consist of construction of site-built cast-in-place lift station concrete structure and associated masonry, site excavation, dewatering, shoring, forming, grubbing, grading, paving, and restoration pertinent, installation of mechanical piping, valving, force mains, to and from the lift station, installation of mechanical piping, valving, force mains internal to the lift station, installation of fusion welding (HDPE), electrical work and connections to the lift station, and all internal electrical components of the lift station, installation and integration of communications, electrical controls, SCADA devices internal to the lift station, and external from the lift station. See attached file.
CityID
Jul 15, 2026
Closes
Sep 4, 2026
Lift station construction. Project generally consists of the following key elements: construction of site-built cast-in-place lift station concrete structure and associated masonry. Site excavation, dewatering, shoring, forming, grubbing, grading, paving, and restoration pertinent to the Lincoln lift station - package 1 project. Installation of mechanical piping, valving, force mains, to and from the lift station. Installation of mechanical piping, valving, force mains internal to the lift station. Installation of fusion welding (HDPE); see attached file.
CityID
Jul 15, 2026
Closes
Sep 4, 2026
Lift station construction. Project generally consists of the following key elements: construction of site-built cast-in-place lift station concrete structure and associated masonry. Site excavation, dewatering, shoring, forming, grubbing, grading, paving, and restoration pertinent to the Lincoln lift station - package 1 project. Installation of mechanical piping, valving, force mains, to and from the lift station. Installation of mechanical piping, valving, force mains internal to the lift station. Installation of fusion welding (HDPE); see attached file.
Procurement and program contacts connected to City of Austin.