CityNC
Posted
Nov 13, 2026
Dec 1, 2026
Richmond Hill Recovery Trail Re-Construction RFP
Richmond Hill Recovery Trail Re-Construction Federally Funded TS Helene Recovery
Description: The City of Asheville seeks bids from an experienced trail builder to reconstruct trail and bike-skills features at Richmond Hill Park that were damaged by Tropical Storm Helene. The work also includes subcontracted engineering design for five reconstructed stream crossings and landscape architecture to replace vegetation important to disc-golf safety. The project is intended to be funded in whole or in part by federal relief funds, and bids are due December 1, 2026, at 3:00 p.m.
City · NC, US
Adjacent opportunities open for bidding right now.
CityNC
Posted
Nov 13, 2026
Dec 1, 2026
Richmond Hill Recovery Trail Re-Construction Federally Funded TS Helene Recovery
CityNC
Posted
Nov 13, 2026
Dec 1, 2026
DESIGN-BUILD: Reconstruction of existing trail and skills features within the original alignment and/or within limits of sustainable trail construction. Existing conditions may necessitate minor rerouting of some trail sections to achieve a sustainable trail. All re-alignment must be Owner-approved. On-site trail flagging of all damaged areas, stream crossings, and skills features, to be verified by Owner; Drainage: Reestablish positive drainage throughout the trail system utilizing USFS principles of sustainabile trail design, natural infiltration and stormwater best management methods; Design and construction of 20 skills features totalling +/- xx linear feet of trail; Design and construction of 4 earthen berms totalling +/- 100 linear feet, and supporting curves on trails; Design and construction of 2 flat-rock berms? totalling +/- 15 linear feet; Design and repair or construction of 5275 FT long x 5 FT wide of typical mountain bike and multi- use trails at various grades, frequency of turns, and difficulty, compacted; Engineering design and construction of 5 timber frame pedestrian bridges (or alternative material) totalling +/- 100 LF; Replacement signage to coincide with new trail design (varying types); Bank stabilization of 290 FT long x avg. 5 FT width x avg. 4 FT depth of stream bank in conjunction with bridge repairs, requiring varying approaches (i.e. live staking, coir logs / matting, revetment, etc.); Drainage: repairs to two sub-trail corrugated culverts including revetment or slope stabilization.
CountyTX
Posted
Nov 6, 2026
Dec 1, 2026
Provide project management, compliance, and technical assistance services for federally funded projects including but not limited to GLO, HUD, HAP, CDBG, CDBG-DR, HOME, ESG, FEMA, other federal and County activities for residential housing recovery, rehabilitations and new construction.
CountyTX
Posted
Nov 6, 2026
Dec 1, 2026
Provide project management, compliance, and technical assistance services for federally funded public facility projects including but not limited to GLO, HUD, HAP, CDBG, CDBG-DR, HOME, ESG, FEMA, other federal and County activities.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from City of Asheville.