Richmond Hill Recovery Trail Re-Construction RFP
Posted
Nov 13, 2026
Dec 1, 2026
DESIGN-BUILD: Reconstruction of existing trail and skills features within the original alignment and/or within limits of sustainable trail construction. Existing conditions may necessitate minor rerouting of some trail sections to achieve a sustainable trail. All re-alignment must be Owner-approved. On-site trail flagging of all damaged areas, stream crossings, and skills features, to be verified by Owner; Drainage: Reestablish positive drainage throughout the trail system utilizing USFS principles of sustainabile trail design, natural infiltration and stormwater best management methods; Design and construction of 20 skills features totalling +/- xx linear feet of trail; Design and construction of 4 earthen berms totalling +/- 100 linear feet, and supporting curves on trails; Design and construction of 2 flat-rock berms? totalling +/- 15 linear feet; Design and repair or construction of 5275 FT long x 5 FT wide of typical mountain bike and multi- use trails at various grades, frequency of turns, and difficulty, compacted; Engineering design and construction of 5 timber frame pedestrian bridges (or alternative material) totalling +/- 100 LF; Replacement signage to coincide with new trail design (varying types); Bank stabilization of 290 FT long x avg. 5 FT width x avg. 4 FT depth of stream bank in conjunction with bridge repairs, requiring varying approaches (i.e. live staking, coir logs / matting, revetment, etc.); Drainage: repairs to two sub-trail corrugated culverts including revetment or slope stabilization.



