Closing soon

Richmond Hill Recovery Trail Re-Construction RFP

Description: DESIGN-BUILD: Reconstruction of existing trail and skills features within the original alignment and/or within limits of sustainable trail construction. Existing conditions may necessitate minor rerouting of some trail sections to achieve a sustainable trail. All re-alignment must be Owner-approved. On-site trail flagging of all damaged areas, stream crossings, and skills features, to be verified by Owner; Drainage: Reestablish positive drainage throughout the trail system utilizing USFS principles of sustainabile trail design, natural infiltration and stormwater best management methods; Design and construction of 20 skills features totalling +/- xx linear feet of trail; Design and construction of 4 earthen berms totalling +/- 100 linear feet, and supporting curves on trails; Design and construction of 2 flat-rock berms? totalling +/- 15 linear feet; Design and repair or construction of 5275 FT long x 5 FT wide of typical mountain bike and multi- use trails at various grades, frequency of turns, and difficulty, compacted; Engineering design and construction of 5 timber frame pedestrian bridges (or alternative material) totalling +/- 100 LF; Replacement signage to coincide with new trail design (varying types); Bank stabilization of 290 FT long x avg. 5 FT width x avg. 4 FT depth of stream bank in conjunction with bridge repairs, requiring varying approaches (i.e. live staking, coir logs / matting, revetment, etc.); Drainage: repairs to two sub-trail corrugated culverts including revetment or slope stabilization.

Buyer
City of Asheville

City · NC, US

Released
Nov 13, 2026
Closes
Dec 1, 2026(14 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts