Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace fire alarm control panel and associated devices.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes to replace the existing edwards fire alarm control panel (facp). Removal and disposal of the existing edwards fire alarm panel. Furnishing and installing a non-proprietary, addressable fire alarm control panel with a minimum of four (4) loops. One loop shall be a 250-point loop installed at time of commissioning. Installation of a new smoke detector above the facp location in accordance with code. Integration of existing initiating and notification devices to the new facp, unless replacement is required for code or compatibility reasons. Programming, testing, and commissioning of the new system. See outside link.
Posted Date
Nov 13, 2025
Due Date
Jan 21, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 21, 2026
Work includes to replace the existing edwards fire alarm control panel (facp). Removal and disposal of the existing edwards fire alarm panel. Furnishing and installing a non-proprietary, addressable fire alarm control panel with a minimum of four (4) loops. One loop shall be a 250-point loop installed at time of commissioning. Installation of a new smoke detector above the facp location in accordance with code. Integration of existing initiating and notification devices to the new facp, unless replacement is required for code or compatibility reasons. Programming, testing, and commissioning of the new system. See outside link.
AvailableThis is controlled maintenance project to replace fire alarm devices and fire alarm panels in the ecot wing of the ucb engineering building complex on the university of colorado boulder campus.
Posted Date
Dec 17, 2025
Due Date
Jan 20, 2026
Release: Dec 17, 2025
Close: Jan 20, 2026
This is controlled maintenance project to replace fire alarm devices and fire alarm panels in the ecot wing of the ucb engineering building complex on the university of colorado boulder campus.
Available2 EA of Pumps, Lift Station-60P; Parts Lift Station-60P; Spare Parts, Lift Station-60P; Startup Services, Lift Station-60P; Control Panel, Lift Station -60P. 2 EA of Pumps, Lift Station-62P; Parts Lift Station-62P; Spare Parts, Lift Station-62P; Startup Services, Lift Station-62P; Control Panel, Lift Station -62P.
Posted Date
Jan 4, 2026
Due Date
Feb 5, 2026
Release: Jan 4, 2026
Close: Feb 5, 2026
2 EA of Pumps, Lift Station-60P; Parts Lift Station-60P; Spare Parts, Lift Station-60P; Startup Services, Lift Station-60P; Control Panel, Lift Station -60P. 2 EA of Pumps, Lift Station-62P; Parts Lift Station-62P; Spare Parts, Lift Station-62P; Startup Services, Lift Station-62P; Control Panel, Lift Station -62P.
AvailableThe existing fire alarm at the Architecture and Design Studio (ADS) building is non-compliant. In addition, this fire alarm system is no longer supported by the industry and presents a challenge in finding replacement parts. The project includes replacing the fire alarm system as well as removal of the old system. The existing building fire alarm system to remain in place and operational until the new system is fully installed, commissioned and accepted by the University. All existing architectural finishes impacted by the removal of the existing fire alarm equipment, devices, conduit, wiring, boxes, etc., shall be restored/repaired to match surrounding conditions.
Posted Date
Aug 13, 2025
Due Date
Feb 4, 2026
Release: Aug 13, 2025
Close: Feb 4, 2026
The existing fire alarm at the Architecture and Design Studio (ADS) building is non-compliant. In addition, this fire alarm system is no longer supported by the industry and presents a challenge in finding replacement parts. The project includes replacing the fire alarm system as well as removal of the old system. The existing building fire alarm system to remain in place and operational until the new system is fully installed, commissioned and accepted by the University. All existing architectural finishes impacted by the removal of the existing fire alarm equipment, devices, conduit, wiring, boxes, etc., shall be restored/repaired to match surrounding conditions.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →