Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The existing fire alarm at the Architecture and Design Studio (ADS) building is non-compliant. In addition, this fire alarm system is no longer supported by the industry and presents a challenge in finding replacement parts. The project includes replacing the fire alarm system as well as removal of the old system. The existing building fire alarm system to remain in place and operational until the new system is fully installed, commissioned and accepted by the University. All existing architectural finishes impacted by the removal of the existing fire alarm equipment, devices, conduit, wiring, boxes, etc., shall be restored/repaired to match surrounding conditions.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
DESIGN-BUILD - service to replace the antiquated fire alarm system.
Posted Date
Oct 17, 2025
Due Date
Jan 20, 2026
Release: Oct 17, 2025
Close: Jan 20, 2026
DESIGN-BUILD - service to replace the antiquated fire alarm system.
AvailableFire alarm system replacement.
Posted Date
Dec 12, 2025
Due Date
Jan 27, 2026
Release: Dec 12, 2025
Close: Jan 27, 2026
Fire alarm system replacement.
AvailableWork includes fire alarm system replacement.
Posted Date
Nov 6, 2025
Due Date
Jan 8, 2026
Release: Nov 6, 2025
Close: Jan 8, 2026
Work includes fire alarm system replacement.
Fire alarm system installation services.
Posted Date
Dec 8, 2025
Due Date
Jan 19, 2026
Release: Dec 8, 2025
Close: Jan 19, 2026
Fire alarm system installation services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis