Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
2 EA of Pumps, Lift Station-60P; Parts Lift Station-60P; Spare Parts, Lift Station-60P; Startup Services, Lift Station-60P; Control Panel, Lift Station -60P. 2 EA of Pumps, Lift Station-62P; Parts Lift Station-62P; Spare Parts, Lift Station-62P; Startup Services, Lift Station-62P; Control Panel, Lift Station -62P.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The work for which proposals are to be received consists of the following: post hurricane ian lift station control panel platforms procurement phase 1
Posted Date
Dec 8, 2025
Due Date
Jan 15, 2026
Release: Dec 8, 2025
Close: Jan 15, 2026
The work for which proposals are to be received consists of the following: post hurricane ian lift station control panel platforms procurement phase 1
AvailableProject consists of replacing six lift station pumps and reconstructing one lift station in its entirety.
Posted Date
Dec 24, 2025
Due Date
Jan 8, 2026
Release: Dec 24, 2025
Close: Jan 8, 2026
Project consists of replacing six lift station pumps and reconstructing one lift station in its entirety.
The City of Sanibel issued an Invitation to Bid for procurement of lift station control panel platforms (Post Hurricane Ian — Phase 1), covering fabrication, delivery, installation, testing and commissioning of control panels and related equipment. The solicitation is distributed via Euna OpenBids/DemandStar and includes a project manual and bid plans available for download through that platform. The bid was broadcast on 2025-12-08 and is open with a due date of 2026-01-15 at 2:30 PM Eastern.
Posted Date
Dec 8, 2025
Due Date
Jan 15, 2026
Release: Dec 8, 2025
Close: Jan 15, 2026
The City of Sanibel issued an Invitation to Bid for procurement of lift station control panel platforms (Post Hurricane Ian — Phase 1), covering fabrication, delivery, installation, testing and commissioning of control panels and related equipment. The solicitation is distributed via Euna OpenBids/DemandStar and includes a project manual and bid plans available for download through that platform. The bid was broadcast on 2025-12-08 and is open with a due date of 2026-01-15 at 2:30 PM Eastern.
Project involves the replacement of an existing small wastewater lift station. Demolition of existing lift station, including removing existing lift station, removing pavements, removing existing equipment and piping, complete in place; Package Lift Station, includes Pumps, Piping, Fittings, Guide Rails, Lift Chains, Vent, Hatches, Valves, Valve Pit, Electrical Equipment Installation including, but not limited to: lift station control panel, terminal boxes, main breaker, manual transfer switch, conduit, wire, and all ancillary devices; 10 LF Proposed 2" PVC SCHED 40 Sanitary Sewer Force Main;
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
Project involves the replacement of an existing small wastewater lift station. Demolition of existing lift station, including removing existing lift station, removing pavements, removing existing equipment and piping, complete in place; Package Lift Station, includes Pumps, Piping, Fittings, Guide Rails, Lift Chains, Vent, Hatches, Valves, Valve Pit, Electrical Equipment Installation including, but not limited to: lift station control panel, terminal boxes, main breaker, manual transfer switch, conduit, wire, and all ancillary devices; 10 LF Proposed 2" PVC SCHED 40 Sanitary Sewer Force Main;
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis