Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of replacing six lift station pumps and reconstructing one lift station in its entirety.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes: Demolish existing pump vase, pressure relieve valve, and piping; construct new reinforced concrete pump pedestal; install pipe to align with owner-furnished pump and motor for High Lift Pump 5; connect new pump to existing discharge piping system; connect new pump to existing discharge piping system; commission and test the completed installation.
Posted Date
Dec 16, 2025
Due Date
Feb 3, 2026
Release: Dec 16, 2025
Close: Feb 3, 2026
Work includes: Demolish existing pump vase, pressure relieve valve, and piping; construct new reinforced concrete pump pedestal; install pipe to align with owner-furnished pump and motor for High Lift Pump 5; connect new pump to existing discharge piping system; connect new pump to existing discharge piping system; commission and test the completed installation.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The contractor will clean, disassemble and repair the broken components of 2 (two) sewer lift station pumps.
Posted Date
Jun 3, 2025
Due Date
Jun 6, 2029
Release: Jun 3, 2025
Close: Jun 6, 2029
The contractor will clean, disassemble and repair the broken components of 2 (two) sewer lift station pumps.
AvailableProvide annual preventative maintenance for 10 lift stations located within the city limits. This will include 23 pumps of different sizes ranging from 5 horsepower to 35 horsepower and all rated at 3 phase power.
Posted Date
Dec 18, 2025
Due Date
Jan 30, 2026
Release: Dec 18, 2025
Close: Jan 30, 2026
Provide annual preventative maintenance for 10 lift stations located within the city limits. This will include 23 pumps of different sizes ranging from 5 horsepower to 35 horsepower and all rated at 3 phase power.
AvailableWet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.
Posted Date
Dec 1, 2025
Due Date
Jan 26, 2026
Release: Dec 1, 2025
Close: Jan 26, 2026
Wet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →