CityIN
Aug 21, 2026
Closes
Sep 8, 2026
2026 Cason Family Park Pedestrian Crossing RFP
Project includes Cason Family Park Pedestrian Crossing, Electrical Route to transformer, Two additional street lights.
Description: Construct the Renton School and Pedestrian Crossing No. 2. The work includes to: improvements to pedestrian crossings at three intersections: Union Avenue NE/NE 8th Street, Hoquiam Avenue NE/NE 5th Street, and 116th Avenue SE/SE 165th Street. Improvements include curb bulb outs, curb ramp replacement, rectangular rapid flashing beacons, permanent signing, storm improvements, street lighting, electrical improvements, pavement patches, pavement markings, traffic control, and surface restoration.
City · WA, US
Original attachments and procurement documents tied to this bid.
Procurement and program contacts connected to City of Renton.
These related opportunities are still open for bidding.
CityIN
Aug 21, 2026
Closes
Sep 8, 2026
Project includes Cason Family Park Pedestrian Crossing, Electrical Route to transformer, Two additional street lights.
CountyCA
Jul 8, 2026
Closes
Sep 8, 2026
Work consists of pedestrian crossing enhancements for various locations. Project consists of providing construction area signs; providing and implementing a traffic control plan, providing and implementing a stormwater pollution prevention plan, constructing concrete curb and gutter, sidewalks, and curb ramps; installing rectangular rapid flashing beacons and associated electrical equipment, pavement reconstruction, installing striping, pavement markings, and signing, and cleaning of the site at the end of the job. The project and its construction activities must include best management practices to protect the environment
CityOR
Aug 14, 2026
Closes
Sep 15, 2026
Construction of the Galveston Ave Pressure Reducing Valve (PRV) Replacement and Pedestrian Crossing. The Work includes installation of a new 6" pressure reducing valve within a precast utility vault, along with all associated piping, fittings, and ancillary valves required for proper operation. The new vault will be connected to the existing water system through approx. 150 LF of 8" ductile iron water main with restrained joints. The scope also includes reconfiguration of existing piping and valves in the intersection of NW 17th Street and Galveston Avenue as necessary to integrate and ensure proper operation of the new PRV. The work further includes removal of the existing pressure reducing valve vault and associated facilities at the intersection of NW 17th Street and Galveston Avenue, along with any piping modifications necessary to accommodate the new PRV installation. This project also includes construction of a new raised pedestrian crossing to enhance pedestrian safety and accessibility in the project area. Work associated with the crossing includes removal and reconstruction of roadway surfaces, pavement markings, signage modifications, and all associated improvements necessary to provide a fully functional crossing. Surface restoration, traffic control, erosion control, and coordination with existing utilities will be required as necessary to complete this work.
Ohio Department of Transportation
State AgencyOH
Aug 18, 2026
Closes
Sep 1, 2026
Provide 644 thermoplastic pavement markings.