Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Anaheim issued an Invitation for Bid (IFB) seeking a qualified specialty company to remove, replace, and furnish security camera equipment at various City facilities, with an initial one-year contract term and up to four one-year options. The work includes removal and installation of specified camera models, mounting hardware, cabling, system configuration and testing, and compliance with applicable laws and manufacturer standards. The procurement is a sealed-bid process with mandatory job walk (pre-bid meeting) and attachments on the City vendor portal (camera list and model contract).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project includes furnishing all labor, materials, equipment and services necessary for and incidental to the Rooftop Unit Replacement project.
Posted Date
Dec 19, 2025
Due Date
Jan 14, 2026
Release: Dec 19, 2025
Close: Jan 14, 2026
The project includes furnishing all labor, materials, equipment and services necessary for and incidental to the Rooftop Unit Replacement project.
AvailableWork include deck removal and replacement, new concrete barrier at the curb line, bridge sidewalk removal and widening and furnishing and installation of deterrent fencing. The project shall include all stages of the work-zone traffic control, furnishing and installation of all materials, access, installation and removal of approved "scaffolding/shielding" system and isolated lead abatement.
Posted Date
Dec 2, 2025
Due Date
Jan 21, 2026
Release: Dec 2, 2025
Close: Jan 21, 2026
Work include deck removal and replacement, new concrete barrier at the curb line, bridge sidewalk removal and widening and furnishing and installation of deterrent fencing. The project shall include all stages of the work-zone traffic control, furnishing and installation of all materials, access, installation and removal of approved "scaffolding/shielding" system and isolated lead abatement.
Work includes design, removal and disposal of old equipment, furnishing, installation of new equipment, and replacement of surfacing and border of the play area. The resulting new play area must be suitable for a demographic ranging from age two (2) to 12 (twelve) years and feature amenities allowing for inclusive play opportunities for all abilities.
Posted Date
Jan 2, 2026
Due Date
Feb 13, 2026
Release: Jan 2, 2026
Close: Feb 13, 2026
Work includes design, removal and disposal of old equipment, furnishing, installation of new equipment, and replacement of surfacing and border of the play area. The resulting new play area must be suitable for a demographic ranging from age two (2) to 12 (twelve) years and feature amenities allowing for inclusive play opportunities for all abilities.
Procurement of services for the dismantling and removal of an existing pedestrian bridge superstructure, and the design, fabrication, furnishing, and installation of a replacement prefabricated pedestrian bridge superstructure.
Posted Date
Jan 6, 2026
Due Date
Jan 22, 2026
Release: Jan 6, 2026
Close: Jan 22, 2026
Procurement of services for the dismantling and removal of an existing pedestrian bridge superstructure, and the design, fabrication, furnishing, and installation of a replacement prefabricated pedestrian bridge superstructure.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis