Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include deck removal and replacement, new concrete barrier at the curb line, bridge sidewalk removal and widening and furnishing and installation of deterrent fencing. The project shall include all stages of the work-zone traffic control, furnishing and installation of all materials, access, installation and removal of approved "scaffolding/shielding" system and isolated lead abatement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Bridge deck replacement.
Posted Date
-
Due Date
Jan 8, 2026
Release: -
Close: Jan 8, 2026
Bridge deck replacement.
AvailablePremium
Access the largest public sector contact database
Bridge joint replacement, structural steel repairs, floor drain extension, and deck sealer. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
Bridge joint replacement, structural steel repairs, floor drain extension, and deck sealer. See outside link.
AvailableWork includes 1 LS clearing and grubbing; 1,742 CY excavation; 62.50 LF guardrail, type mgs; 12 EA mgs bridge terminal assembly, type 1; 171 LF fence, type 47; 114 LF concrete barrier, single slope, type c-50; 169 CY topsoil; 505 SY seeding and mulching; 1,005 SY slope erosion protection; 15 LF 4" unclassified pipe underdrains; 18 LF 12" conduit, type b; 9 EA precast reinforced concrete outlet; 641 CY asphalt concrete base; 97 CY aggregate base; 585 GAL non-tracking tack coat; 70.30 SF sign, flat sheet; 25 LF stop line, type 1; 750 SF patching concrete structure.
Posted Date
Dec 10, 2025
Due Date
Jan 8, 2026
Release: Dec 10, 2025
Close: Jan 8, 2026
Work includes 1 LS clearing and grubbing; 1,742 CY excavation; 62.50 LF guardrail, type mgs; 12 EA mgs bridge terminal assembly, type 1; 171 LF fence, type 47; 114 LF concrete barrier, single slope, type c-50; 169 CY topsoil; 505 SY seeding and mulching; 1,005 SY slope erosion protection; 15 LF 4" unclassified pipe underdrains; 18 LF 12" conduit, type b; 9 EA precast reinforced concrete outlet; 641 CY asphalt concrete base; 97 CY aggregate base; 585 GAL non-tracking tack coat; 70.30 SF sign, flat sheet; 25 LF stop line, type 1; 750 SF patching concrete structure.
AvailableProject consists of Milling the existing bridge decks, Patching delaminated concrete, Portland Cement Concrete Overlay (PCCO), Concrete Surface Repair, Deck Drain Extensions, Embedded Galvanic Anodes, Milling the existing asphalt approaches, HMA-Commercial Grade Asphalt, and Traffic Control.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
Close: Dec 16, 2025
Project consists of Milling the existing bridge decks, Patching delaminated concrete, Portland Cement Concrete Overlay (PCCO), Concrete Surface Repair, Deck Drain Extensions, Embedded Galvanic Anodes, Milling the existing asphalt approaches, HMA-Commercial Grade Asphalt, and Traffic Control.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis