Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work on the bridge structure includes the removal and replacement of the cross beams, deck, steel curbs, sidewalk, bridge railing and deck joints along the Tower Spans of the Burlington-Bristol Bridge. Bridge railing removal requires the relocation of existing conduits attached to the bridge railing. Conduit relocation is required to be completed prior to demolition of the bridge deck and other bridge elements with new cabling tested and approved. A structural health monitoring system is installed on the bridge which will remain operational throughout the project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project includes Replace the existing bridge deck. Additional rehabilitation work at the bridges includes replacement of the expansion joints and bearings; miscellaneous patching of the substructure, composite fiber wrap of pier columns, sealing of all construction joints; performing concrete weatherproofing; maintenance of traffic; painting of structural steel; and all other items incidental to the completion of the Work.
Posted Date
Jan 22, 2026
Due Date
Feb 12, 2026
Release: Jan 22, 2026
Close: Feb 12, 2026
Project includes Replace the existing bridge deck. Additional rehabilitation work at the bridges includes replacement of the expansion joints and bearings; miscellaneous patching of the substructure, composite fiber wrap of pier columns, sealing of all construction joints; performing concrete weatherproofing; maintenance of traffic; painting of structural steel; and all other items incidental to the completion of the Work.
AvailableProcurement for replacing the existing bridge deck and associated infrastructure on the Crookton Road at BNSF Railroad Overpass Bridge.
Posted Date
Dec 12, 2025
Due Date
Feb 6, 2026
Release: Dec 12, 2025
Close: Feb 6, 2026
Procurement for replacing the existing bridge deck and associated infrastructure on the Crookton Road at BNSF Railroad Overpass Bridge.
AvailableThis RFP is for the removal and replacement of existing decking on the Hedges Green pedestrian bridge with new pressure-treated glulam decking, including installation of fasteners and creation of an ADA-compliant walking surface.
Posted Date
Jan 14, 2026
Due Date
Feb 12, 2026
Release: Jan 14, 2026
Close: Feb 12, 2026
This RFP is for the removal and replacement of existing decking on the Hedges Green pedestrian bridge with new pressure-treated glulam decking, including installation of fasteners and creation of an ADA-compliant walking surface.
AvailableBridge reconstruction including replacement of the southern portion of the superstructure, deck and barrier of span.
Posted Date
Jan 9, 2026
Due Date
Feb 6, 2026
Release: Jan 9, 2026
Close: Feb 6, 2026
Bridge reconstruction including replacement of the southern portion of the superstructure, deck and barrier of span.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis