Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Burlington County Soil Conservation District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Burlington County Soil Conservation District
The work on the bridge structure includes the removal and replacement of the cross beams, deck, steel curbs, sidewalk, bridge railing and deck joints along the Tower Spans of the Burlington-Bristol Bridge. Bridge railing removal requires the relocation of existing conduits attached to the bridge railing. Conduit relocation is required to be completed prior to demolition of the bridge deck and other bridge elements with new cabling tested and approved. A structural health monitoring system is installed on the bridge which will remain operational throughout the project.
Posted Date
Jan 9, 2026
Due Date
Mar 26, 2026
Release: Jan 9, 2026
Burlington County Soil Conservation District
Close: Mar 26, 2026
The work on the bridge structure includes the removal and replacement of the cross beams, deck, steel curbs, sidewalk, bridge railing and deck joints along the Tower Spans of the Burlington-Bristol Bridge. Bridge railing removal requires the relocation of existing conduits attached to the bridge railing. Conduit relocation is required to be completed prior to demolition of the bridge deck and other bridge elements with new cabling tested and approved. A structural health monitoring system is installed on the bridge which will remain operational throughout the project.
AvailableBurlington County Soil Conservation District
Concrete and steel repairs for the tacony-palmyra bridge.
Posted Date
Nov 21, 2025
Due Date
Jan 29, 2026
Release: Nov 21, 2025
Burlington County Soil Conservation District
Close: Jan 29, 2026
Concrete and steel repairs for the tacony-palmyra bridge.
Burlington County Soil Conservation District
To perform structural steel repairs, concrete deck repairs, timber fender repairs and painting. This shall include the removal of all vegetation growth on the existing fender, verification of existing dimensions for ordering purposes, supplying the new members, and removal and replacement of deteriorated members.
Posted Date
Sep 26, 2025
Due Date
Dec 10, 2025
Release: Sep 26, 2025
Burlington County Soil Conservation District
Close: Dec 10, 2025
To perform structural steel repairs, concrete deck repairs, timber fender repairs and painting. This shall include the removal of all vegetation growth on the existing fender, verification of existing dimensions for ordering purposes, supplying the new members, and removal and replacement of deteriorated members.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.