Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Burlington County Soil Conservation District
Concrete and steel repairs for the tacony-palmyra bridge.
Posted Date
Nov 21, 2025
Due Date
Jan 29, 2026
Release: Nov 21, 2025
Burlington County Soil Conservation District
Close: Jan 29, 2026
Concrete and steel repairs for the tacony-palmyra bridge.
Burlington County Soil Conservation District
The project is for replacement of submarine power cables (2) and submarine control cables (2) between Pier E and Pier F of the Bridge. Additionally, a submarine fiber optic cable is to be installed between Pier E and Pier F of the Bridge. The submarine cables shall be armored for underwater installation in a trench at a depth of five (5) feet below the bottom of the navigable channel. The armored cables are terminated in boxes located six (6 ft.) above the 100-year flood level as shown in the plans. The cables continue up each pier, from the termination boxes, in PVC coated rigid galvanized steel conduit to the regulator rooms and control rooms in each tower. Power cables are terminated in the regulator rooms and control rooms in each tower. Control cables are terminated in the control rooms within each tower. The fiber optic cable is terminated in the control rooms within each tower.
Posted Date
Mar 3, 2026
Due Date
Apr 23, 2026
Release: Mar 3, 2026
Burlington County Soil Conservation District
Close: Apr 23, 2026
The project is for replacement of submarine power cables (2) and submarine control cables (2) between Pier E and Pier F of the Bridge. Additionally, a submarine fiber optic cable is to be installed between Pier E and Pier F of the Bridge. The submarine cables shall be armored for underwater installation in a trench at a depth of five (5) feet below the bottom of the navigable channel. The armored cables are terminated in boxes located six (6 ft.) above the 100-year flood level as shown in the plans. The cables continue up each pier, from the termination boxes, in PVC coated rigid galvanized steel conduit to the regulator rooms and control rooms in each tower. Power cables are terminated in the regulator rooms and control rooms in each tower. Control cables are terminated in the control rooms within each tower. The fiber optic cable is terminated in the control rooms within each tower.
AvailableBurlington County Soil Conservation District
The work on the bridge structure includes the removal and replacement of the cross beams, deck, steel curbs, sidewalk, bridge railing and deck joints along the Tower Spans of the Burlington-Bristol Bridge. Bridge railing removal requires the relocation of existing conduits attached to the bridge railing. Conduit relocation is required to be completed prior to demolition of the bridge deck and other bridge elements with new cabling tested and approved. A structural health monitoring system is installed on the bridge which will remain operational throughout the project.
Posted Date
Jan 9, 2026
Due Date
Mar 26, 2026
Release: Jan 9, 2026
Burlington County Soil Conservation District
Close: Mar 26, 2026
The work on the bridge structure includes the removal and replacement of the cross beams, deck, steel curbs, sidewalk, bridge railing and deck joints along the Tower Spans of the Burlington-Bristol Bridge. Bridge railing removal requires the relocation of existing conduits attached to the bridge railing. Conduit relocation is required to be completed prior to demolition of the bridge deck and other bridge elements with new cabling tested and approved. A structural health monitoring system is installed on the bridge which will remain operational throughout the project.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Burlington County Soil Conservation District
The audit report includes a review of financial statements, internal controls, and compliance with government auditing standards. It covers comparative statements of support, revenue, expenditures, and cash flows, as well as notes to the financial statements. The report also includes schedules of expenditures for federal and state awards, findings and noncompliance, and prior year findings. Additionally, it contains comments and recommendations related to the financial operations of the district.
The meeting covered financial matters, correspondence including higher interconnection costs for the Tatleaux Solar Group project, and staff reports on transitioning to QuickBooks. The NRCS report included updates on summer internships, obligated contracts, and civil rights reviews. The District Manager's report highlighted inspections, ROC issuances, plan reviews, solar panel approvals, MS4 compliance services, and the FY 2022 District Audit. Old business included supervisor reappointments, and new business covered the 2022 NACD Northeast Regional Meeting, FY 2023 Budget adoption, and Senate Bill 2639.
The meeting covered financial matters, including the closure of a CD at Delmarva Bank and the opening of a new CD at TD Bank, as well as the review of CD rates at Republic Bank. Correspondence included notifications from the Department of Defense, NACD, Burlington County Board of Agriculture and Farm Bureau, and ENVIROCERT. Staff reports highlighted Chapter 251 inspections and new applications, including those for warehouses and solar panels. The NRCS report mentioned plans for certification and funding for irrigation system conversion. The District Manager's report provided a snapshot of activity for August 2022, including inspections, ROC issuance, plan reviews, and MS4 inspections. The meeting also discussed building maintenance, MS4 compliance services, Senate Bill 2639, the NJACD Annual Partnership Meeting, and the NJ League of Municipalities. Chapter 251 & RFA matters were reviewed, including certifications for various projects. An executive session was held, followed by discussions on the USDA Lease Extension and the FY 2022 Audit.
The meeting addressed financial matters, including CD maturities and investment opportunities, and approved the payment of bills. Correspondence included updates on Soil and Water Stewardship Week and Supervisor Performance Standards. Staff reported on basin inspections and dust control measures. NRCS provided updates on EQIP program funding and a newly hired Quail Biologist. The District Manager reported on inspections, ROC issuances, plan reviews, and MS4 inspections, as well as solar panel approval progress and liaison meeting discussions. The board discussed budget composition, a proposed Cost of Living Adjustment for FY 2023, Supervisor reappointments, Supervisor Performance Standards, and a Smithville Lake Grant, including a Letter of Support and an In-Kind contribution.
The meeting covered financial matters, including the rollover of a CD at Liberty Bell Bank and the review and acceptance of bills to be paid for March. Correspondence was reviewed, including notifications from various departments and organizations. Staff reports were given, covering topics such as construction activity, building security measures, and the transition to Quickbooks. The MS4 Program, District Solar Panels, and SJRC&D were also discussed. A recommendation was made to hire a Site Inspector instead of a Natural Resource Specialist. Updates were provided on building re-opening, including the removal of masking requirements and the resumption of in-person meetings. The meeting also included a discussion and approval of Chapter 251 & RFA certifications.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Burlington County Soil Conservation District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database