Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Upgrade the HVAC and Electrical systems for the Data Center in the Twin Rise Building. The replacement of the main electrical distribution system for the building and the renovation and upgrade of the campus’s main data center within the basement of the building. Data center renovation and improvements consist of complete mechanical and electrical upgrades as well as architectural renovations to provide a suitable data center space for the needs of the campus. Structural supports for the proposed generator, various motor replacements with VFD control and asbestos abatement is also part of the project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide rehab of the 7th floor data center by demolishing and removing existing equipment and installing new infrastructure.
Posted Date
Jan 13, 2026
Due Date
Feb 18, 2026
Release: Jan 13, 2026
Close: Feb 18, 2026
Provide rehab of the 7th floor data center by demolishing and removing existing equipment and installing new infrastructure.
AvailableProvide electrical, plumbing, HVAC service for various county facilities.
Posted Date
-
Due Date
Feb 18, 2026
Release: -
Close: Feb 18, 2026
Provide electrical, plumbing, HVAC service for various county facilities.
AvailableProvide service contract for hvac & hvac control systems.
Posted Date
Jan 14, 2026
Due Date
Feb 3, 2026
Release: Jan 14, 2026
Close: Feb 3, 2026
Provide service contract for hvac & hvac control systems.
AvailableThe work to be performed for this item includes, but is not limited to, the demolition of the existing electrical equipment and concrete housekeeping pad, installing new concrete housekeeping pad, installing a new motor control center, installing new electrical equipment, connecting the existing 40HP to 480V and all the appurtenances as shown on the plans and in these Special Provisions.
Posted Date
Dec 24, 2025
Due Date
Feb 4, 2026
Release: Dec 24, 2025
Close: Feb 4, 2026
The work to be performed for this item includes, but is not limited to, the demolition of the existing electrical equipment and concrete housekeeping pad, installing new concrete housekeeping pad, installing a new motor control center, installing new electrical equipment, connecting the existing 40HP to 480V and all the appurtenances as shown on the plans and in these Special Provisions.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis