Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide rehab of the 7th floor data center by demolishing and removing existing equipment and installing new infrastructure.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Upgrade the HVAC and Electrical systems for the Data Center in the Twin Rise Building. The replacement of the main electrical distribution system for the building and the renovation and upgrade of the campus’s main data center within the basement of the building. Data center renovation and improvements consist of complete mechanical and electrical upgrades as well as architectural renovations to provide a suitable data center space for the needs of the campus. Structural supports for the proposed generator, various motor replacements with VFD control and asbestos abatement is also part of the project.
Posted Date
Jan 20, 2026
Due Date
Feb 12, 2026
Release: Jan 20, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 12, 2026
Upgrade the HVAC and Electrical systems for the Data Center in the Twin Rise Building. The replacement of the main electrical distribution system for the building and the renovation and upgrade of the campus’s main data center within the basement of the building. Data center renovation and improvements consist of complete mechanical and electrical upgrades as well as architectural renovations to provide a suitable data center space for the needs of the campus. Structural supports for the proposed generator, various motor replacements with VFD control and asbestos abatement is also part of the project.
AvailableData resource center modernization.
Posted Date
Jan 12, 2026
Due Date
Feb 10, 2026
Release: Jan 12, 2026
Close: Feb 10, 2026
Data resource center modernization.
AvailableProcurement of services to remove and replace four air conditioning units and integrate them into the existing chilled water infrastructure in the Data Center at the Las Vegas Convention Center.
Posted Date
Jan 12, 2026
Due Date
Feb 3, 2026
Release: Jan 12, 2026
Close: Feb 3, 2026
Procurement of services to remove and replace four air conditioning units and integrate them into the existing chilled water infrastructure in the Data Center at the Las Vegas Convention Center.
AvailableRemove and replace four air conditioning units and tie into the existing chilled water infrastructure in the data center.
Posted Date
Jan 12, 2026
Due Date
Feb 3, 2026
Release: Jan 12, 2026
Close: Feb 3, 2026
Remove and replace four air conditioning units and tie into the existing chilled water infrastructure in the data center.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →