Closing soon

Raw Water Main Transmission Pipeline Replacement, Dodge to Richardton SWPP

Description: Installing 2,004 LF of 42" class 250 ductile iron pipe (DIP) with a bonded coating system; removing and replacing 540 LF of 30" class 250 DIP with a bonded coating system; furnishing 200 LF of additional 30" class 250 DIP with bonded coating; furnishing and installing reinforced concrete pipe weights; furnishing and installing 4 concrete manholes with appurtenant items, 4 owner-coordinated tie-ins to existing; 30" DIP with restrained fittings and concrete thrust blocks; furnishing and installing restraining harnesses on the existing pipeline near tie-in locations; furnishing and installing all cathodic protection items, including joint bonds, test stations, and insulating couplers; furnishing and installing joint closures as shown on the drawings; and furnishing and installing all other related appurtenances. The documents include a bid alternate to furnish and install 2,004 LF of controlled low strength material for abandoning the existing 30" pipeline.

Buyer
Released
Aug 6, 2026
Closes
Aug 25, 2026(13 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts