Souris River Joint Water Resources Board
Special DistrictND
Aug 6, 2026
Closes
Aug 25, 2026
Raw Water Main Transmission Pipeline Replacement, Dodge to Richardton SWPP
Installing 2,004 LF of 42" class 250 ductile iron pipe (DIP) with a bonded coating system; removing and replacing 540 LF of 30" class 250 DIP with a bonded coating system; furnishing 200 LF of additional 30" class 250 DIP with bonded coating; furnishing and installing reinforced concrete pipe weights; furnishing and installing 4 concrete manholes with appurtenant items, 4 owner-coordinated tie-ins to existing; 30" DIP with restrained fittings and concrete thrust blocks; furnishing and installing restraining harnesses on the existing pipeline near tie-in locations; furnishing and installing all cathodic protection items, including joint bonds, test stations, and insulating couplers; furnishing and installing joint closures as shown on the drawings; and furnishing and installing all other related appurtenances. The documents include a bid alternate to furnish and install 2,004 LF of controlled low strength material for abandoning the existing 30" pipeline.