Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Fort Worth is inviting electronic bids for the Water and Sanitary Sewer Replacement Contract 2019, WSM-I Part 1, including plans and a project manual provided in the portal. The procurement is an ITB for construction to replace and upgrade water and sanitary sewer infrastructure within Fort Worth. A virtual pre-bid is scheduled, questions are due Feb 12, 2026, and bids are due Feb 19, 2026 at 2:00 PM CST via Bonfire.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
Posted Date
Jan 13, 2026
Due Date
Jan 30, 2026
Release: Jan 13, 2026
Close: Jan 30, 2026
The project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
AvailableWork of the contract includes the rehabilitation of sanitary sewers and manholes. Rehabilitation measures will also require maintenance and control of traffic as specified in the contract drawings. Surveying of sanitary sewers and manholes via closed-circuit television (cctv) is required before and after construction is completed. Work also includes 1 LS erosion and sedimentation control measures; 1 LS runway and taxiway closure, restoration, and reopening including temporary construction items; 1 LS sewer bypass - area 1 - pumped bypass; 2 CY rock and obstruction excavation, all depths. See attached file.
Posted Date
Dec 12, 2025
Due Date
Jan 29, 2026
Release: Dec 12, 2025
Close: Jan 29, 2026
Work of the contract includes the rehabilitation of sanitary sewers and manholes. Rehabilitation measures will also require maintenance and control of traffic as specified in the contract drawings. Surveying of sanitary sewers and manholes via closed-circuit television (cctv) is required before and after construction is completed. Work also includes 1 LS erosion and sedimentation control measures; 1 LS runway and taxiway closure, restoration, and reopening including temporary construction items; 1 LS sewer bypass - area 1 - pumped bypass; 2 CY rock and obstruction excavation, all depths. See attached file.
The City of Minneapolis issued an RFx titled 'BID-PW-Clay Sanitary Sewer Pipe' (Event ID 0000004008) to procure sanitary sewer pipe work. The solicitation was posted on 2026-01-14 and bids are due on 2026-01-28; the opportunity is listed as an informal RFx (Sell) and has an estimated value range of $100,000 - $500,000 per aggregator estimate. The official posting is on the City's eSupplier/COMET procurement system.
Posted Date
Jan 14, 2026
Due Date
Jan 28, 2026
Release: Jan 14, 2026
Close: Jan 28, 2026
The City of Minneapolis issued an RFx titled 'BID-PW-Clay Sanitary Sewer Pipe' (Event ID 0000004008) to procure sanitary sewer pipe work. The solicitation was posted on 2026-01-14 and bids are due on 2026-01-28; the opportunity is listed as an informal RFx (Sell) and has an estimated value range of $100,000 - $500,000 per aggregator estimate. The official posting is on the City's eSupplier/COMET procurement system.
AvailableWork includes 2,250 LF portland cement concrete sidewalk replacement; 622 LF portland cement concrete curb and gutter replacement; 2,200 LF 8" pvc sanitary sewer main replace existing in place (open trench); 2 EA install new sanitary sewer manhole in new location; 5 EA remove and replace existing sanitary sewer manhole in place; 1 LS remove sanitary sewer rodding inlet; 3 EA sanitary sewer main connection to existing manhole; 1 EA existing sanitary sewer manhole rehabiiltation; 43 EA 4" sanitary sewer lateral, cleanout, and box replacement (open trench). See attached file.
Posted Date
Jan 13, 2026
Due Date
Feb 17, 2026
Release: Jan 13, 2026
Close: Feb 17, 2026
Work includes 2,250 LF portland cement concrete sidewalk replacement; 622 LF portland cement concrete curb and gutter replacement; 2,200 LF 8" pvc sanitary sewer main replace existing in place (open trench); 2 EA install new sanitary sewer manhole in new location; 5 EA remove and replace existing sanitary sewer manhole in place; 1 LS remove sanitary sewer rodding inlet; 3 EA sanitary sewer main connection to existing manhole; 1 EA existing sanitary sewer manhole rehabiiltation; 43 EA 4" sanitary sewer lateral, cleanout, and box replacement (open trench). See attached file.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis