CityOH
Jul 18, 2026
Closes
Aug 28, 2026
Lawrence Street Pump Station Replacement Project RFP
Project consists construction of a new valve vault containing a check valve, pipe supports, an access hatch, and all supporting appurtenances.
Description: The project includes replacing approx. 2,210 LF of existing 10" sewer with 18" PVC sewer main, installation of 12 manholes, a 30" steel casing bore under Market Street, and all associated excavation, traffic control, bypass pumping, pavement restoration, and related work.
City · NC, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to Town of Smithfield.
These related opportunities are still open for bidding.
CityOH
Jul 18, 2026
Closes
Aug 28, 2026
Project consists construction of a new valve vault containing a check valve, pipe supports, an access hatch, and all supporting appurtenances.
CityNJ
Aug 5, 2026
Closes
Sep 2, 2026
Rehabilitation of the existing sanitary sewer pump station, including but not limited to: site preparation and selective demolition; temporary bypass pumping; soil erosion and sediment control; furnishing and installing new submersible wet well pumps, variable frequency drives, guide rail system, and appurtenant hardware; furnishing and installing a new grinder unit, rail system, and control panel; furnishing and installing a new above-grade duplex valve vault complete with valves, access hatch, davit crane, bypass connection, flow meter, and controls; demolition and decommissioning of the existing dry well; new yard piping; furnishing and installing all electrical wiring, components, equipment, and appurtenances; removal and disposal of an existing underground propane tank, including permitting; and site restoration including surface restoration, fencing, and bollards.
CityNC
Jul 14, 2026
Closes
Aug 18, 2026
Construction and installation of approx. 230 LF of sanitary sewer in various sizes, approx. 4,500 LF of force main in various sizes, 2 sewage pumping stations, associated manholes, services, fittings, casings, drybores, appurtenances, demolition, clearing and other work.
CountyIN
Jul 28, 2026
Closes
Aug 19, 2026
Construction will improve the drainage along Clark Street and include replacement of the culvert pipe on driven piles that conveys water from the existing roadside ditch across Clark Street to the existing outfall on the west side (approx. 60 FT). The project also includes installation of new guardrail and aggregate shoulder along Clark Street, associated pavement restoration, and grading improvements to the existing ditch.