Spade Pump Station Improvements RFP
-
Closes
Sep 24, 2026
Project includes the installation of a new pump station facility that will include an engineered metal building with a bridge crane within the pump room, an electrical room, as well as a new restroom and necessary ADA facilities. The pump station will be designed as a 2+1 pump operation to deliver up to 23 MGD. The project also includes a two-million gallon ground storage tank and the procurement of electrical substation equipment.
