Posted
Nov 19, 2026
Dec 21, 2026
Acoustical Ceilings RFP
The solicitation seeks bids for acoustical ceilings and other construction trades for both phases of the Mission Bay South Block 4E project. The project includes a 16-story south tower with 165 units and a 23-story north tower with 233 units, and is described as 100% affordable housing. Individual proposals are required for each tower, with construction scheduled to start in April 2027 for Phase I and February 2028 for Phase II.
