Description: The Village of Orland Park is seeking proposals for its Public Works Renovation Project. The overall project includes constructing a new salt storage building, renovating the south garage and locker/restrooms, and installing a new generator with related HVAC, structural, life-safety, paving, stormwater, and utility work. Construction may begin no earlier than January 1, 2027, and must be completed by October 1, 2028.
City · IL, US
Decision makers connected to this RFP from Village of Orland Park.
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
CityIL
Posted
Nov 16, 2026
Dec 4, 2026
This is the precast structural concrete package associated with the Public Works Renovation Project. The project includes constructing a new salt storage building and renovating the Public Works south garage and locker/restrooms. It also includes a new generator and associated HVAC, structural, life-safety, paving, stormwater, and utility work.
CityIL
Posted
Nov 17, 2026
Dec 4, 2026
The Village of Orland Park is seeking proposals for a new salt storage building and renovations to the Public Works south garage and locker/restrooms. The project also includes installing a generator and associated HVAC, structural, life-safety, paving, stormwater, and utility work. Construction may not begin before January 1, 2027, and work must be completed by October 1, 2028.
CityIL
Posted
Nov 17, 2026
Dec 3, 2026
The project includes construction of a pre-engineered wood-framed salt/brine/material storage building with adjacent concrete storage bins. It also includes demolition of existing buildings and renovation of the existing south garage and salt storage area. The administration area will be expanded to provide locker space.
CityIL
Posted
Nov 17, 2026
Dec 3, 2026
This posting is for acoustical ceilings as part of a Public Works renovation project. The AI overview describes a pre-engineered wood-framed salt/brine/material storage building with concrete storage bins, demolition of existing structures, and renovation of the existing garage and salt storage area. It also lists expansion of the administration area for locker space.